boiler supplier

2 ton diesel steam boiler for autoclave

Third, look at the quality of its after-sales support services

When choosing a good industrial steam boiler manufacturers, after-sale protection is a very important issue. If the manufacturer can provide us with good service, then we can reduce unnecessary waste of human and material resources consumed, the boiler will have a better experience.

Boiler combustion pressure causes a positive pressure combustion boiler, the furnace in the high temperature flue gas will enter the boiler furnace wall insulating layer cracks in the insulation layer will burn, so that the non-heated heat boiler pressure parts, such as drop tube, destroyed circulation induced accidents boiler waterwall squib like. Below you tell us about the cause of the positive pressure combustion. 1, low level fireman operation. Most of these farmers from suburban fireman, just burn a heating period in winter, highly seasonal, work unit is not fixed, so poor sense of responsibility; they are generally older, low cultural quality, and some of the drums, Fan ratio of air volume adjustment does not understand, the operation level difference. Resulting in positive pressure boiler combustion. 2, flue blockage. Flue blockage or fouling generally due to refractory loss caused in the flue. 3, boiler air leakage. Boiler leakage mainly refers to the rear of the boiler some observations door, cleaning door, flue dust collector, induced draft fan and other damage caused by perforation corrosion and wear a lot of cold air entering the combustion pressure induced draft fan and overload. 4, induced draft fan air flow, insufficient air pressure. By the induced draft fan air flow, insufficient air pressure caused by pressurized boiler combustion, there are two cases, one is due to the transformation of the boiler flue gas dust removal increases the resistance caused by insufficient wind pressure; the other is due to the induced draft fan for years of use induced draft fan blade caused by corrosion and wear, the induced draft fan wind, air pressure decreases. 5, for increased heat. This is due to the increased heat supply exceeds the capacity of the boiler pressure had to burn method to solve the problem of insufficient heat supply. Therefore boiler inspection, management and operating personnel should pay great attention to the phenomenon of pressurized combustion boilers. Boiler combustion pressure to promptly identify and eliminate the cause, preventing boiler accidents, ensure the safety of the boiler.

Burns Hospital Affiliated Hospital of Shanxi Linfen Linfen Steel is attending a hospital burns burns and other diseases. Hot water boiler is essential hospital equipment heat, hot water output can provide disinfection of medical instruments and ward heating demand. With constantly improving our environmental policy, boiler correspondingly introduced more sophisticated Use. Linfen hospital burns to respond positively to the national environmental policy, decided to introduce an environmentally friendly low nitrogen gas hot water boiler. Taking into account the special circumstances of the hospital, the boiler should also have the use of safe, clean overall characteristics. Based on the above considerations, finalize the Linfen hospital with burns boiler party cooperation fast, fast is provided by one side of a gas condensing pressure hot water boiler (CWNS2.1-95 / 70-Y.Q).

When the auxiliary boiler maintenance shutdown 1, grate boiler: Check the grate wear cleared up the middle slot fouling, if necessary, replace the grate. Grate front axle oil level check, timely lubrication. Check whether the switch lever grate Flexible damper sides. Start fan running for 20 minutes, to grate fouling purge. 2, reducer: the oil discharge portion open vent hole, where the oil quality was observed. The need to replace all the oil inside the gear if necessary. 3, blowers: inspection hole open the fan, blade wear inspection, balancing the fan if required wear readjustment. Fouling bottom clean-up fan housing. Check the oil level air quality timely replacement of oil, add oil. Pairs of primers were cleaning the bottom of the blower housing. 4. Cleaner: Cleaner will take over the ditch water discharge submersible pumps, check Cleaner chain wear, replace valve if necessary chain. Check the Cleaner head bearing box oil level, add oil in a timely manner. 5, filter: filter for internal cleaning process. 6, the air compressor: compressor oil level check, timely oiling. After the dust clean-up is complete, turn on the air compressor to purge the filter to work. 7, chimneys: Open the bottom of the chimney, cleanup internal fouling. 8, decontamination: the decontamination out of the water valve closed, open decontamination hand hole, decontamination of sludge within the debris clean up, clean-up after the completion of the closed hand hole, out of the water valve and open the drain valve decontamination for decontamination flushing. After draining off water until the drain valve. 9, the valve: The pump room and the boiler room of the check valve, leaks, opening and closing is flexible tight.

Related Information