boiler supplier

200tph net hps cfb boiler

Use steam 200tph net hps cfb boiler pressure gauge should pay attention to the following items: 1, rated steam pressure is less than 2.45MPa steam boiler, pressure gauge accuracy must not be both 2. 5; Rated steam pressure large or equal to 2.45MPa boiler, pressure must not be less than 1. 5 class. The dial diameter of the pressure gauge shall not be less than 100 mm to ensure that the operator can see the surface pressure indication clearly. 2. A red line should be drawn on the pressure dial of the steam boiler pressure gauge, indicating the maximum allowable working pressure. 3. Steam boiler pressure gauges should be installed in places that are easy to observe and rinse, and should be protected from the shadows of high temperatures, freezes and vibrations Ring. 4, steam boiler pressure gauge should be checked at least once every six months, after calibration should be sealed. 5, steam boiler pressure gauge connection pipe should not leak, steam leakage phenomenon, otherwise will reduce the pressure indicator value. 6. The range of the steam boiler pressure gauge shall be adapted to the working pressure of the measured components, usually 1.5 times of the working pressure, preferably 2 times of the working pressure. Steam boiler does not have a pressure gauge, the pressure gauge is damaged or the installation of the pressure gauge does not meet the requirements, steam boiler pressure gauge should be stopped when one of the following: 1, broken surface glass or dial calibration unclear; 2, no lead seal, lead seal damage or Beyond the calibration period; 3, when there is no pressure, the pressure gauge pointer of the finite pin cannot be restored to the limit pin, and the data of the infinite position gauge pointer deviating from the zero position exceeds the pressure coat allowed? Poor; 4, gas leak or pointer jump in the meter; 5, other defects that affect the accuracy of the gauge.

Supply fire tube steam 200tph net hps cfb boiler to Germany

We offer highly efficient range of fire tube steam boilers available in horizontal design for our varied customers. Our boilers are also available in various capacities and working pressure. It is suited for varied steam applications.

It is reported that Inner Mongolia has issued a "winning Blue Sky Battle three-year action plan to implement the program," out of shutting down 300,000 kilowatts coal-fired units of non-compliance. Vigorously promote the region's coal-fired units (excluding the circulating fluidized bed and "W" Flame Boiler) ultra-low emission transformation, by the end of 2018, Wuhai City and the surrounding areas all in-service thermal power coal-fired units basically completed the transformation; by the end of 2020 before, with the rest of the transformation of the conditions to complete the transformation of coal-fired power plants all. And promote the implementation of the transformation of ultra-low emissions and steel industries.

First, the implementation of dual control energy consumption. And vigorously promote the total energy consumption and intensity "dual control" to promote the reduction of coal consumption through energy saving. Earnestly implement the autonomous region, "" Thirteen five "comprehensive energy conservation program of work for carbon reduction" and "energy saving" Thirteen Five "plan", by the end of 2020, the region's total energy consumption control at around 225 million tons of standard coal, coal accounts the proportion of total energy consumption decreased from 82.9% in 2015 to 79% unit GDP energy consumption fell 14% from 2015. According to focus on the use of coal and clean use of principles, focusing on reduction of non-coal for electricity, increase the proportion of electricity from coal, coal power accounted raise the proportion of total coal consumption to around 55%.

Second, the development of clean energy and new energy. By the end of 2020, non-fossil energy consumption reached about 25 million tons. An orderly wind power and photovoltaic power generation projects, optimization of wind energy, solar energy development layout. Increase renewable energy consumptive efforts to solve the basic wind abandoned, abandoned light problem. By the end of 2020, the region consumptive wind power capacity has reached 45 million kilowatts, 15 million kilowatts of photovoltaic power generation reached.

According to the material grade used in gas condensing 200tph net hps cfb boiler. To distinguish the quality of gas-fired condensing boiler, it is necessary to determine its material grade first. Because gas-fired condensing boiler needs long-term contact with condensate water, and impurities in condensing water may cause it to have a certain degree of acidity or oxidizability, so the gas-fired condensing boiler has a certain degree of acidity or oxidation. The material of choice must be stainless steel with high iron resistance, aluminum alloy or austenitic stainless steel body in order to ensure its long-term use.

Related Information