boiler supplier

400ton biomass fired boiler colombiause for heating industry

The use of central heating hot water 400ton biomass fired boiler colombiause for heating industry is the best choice for winter heating in northern China. Shanxi Province is located in Chang Darrow Heating Co., Ltd. mainly provides heating and post-service maintenance of heating equipment, heating clients involved in enterprises and institutions, office buildings, residential housing and a variety of commercial and other entertainment venues. With the wide blue sky covered Battle of the project, China's gradual increase in the proportion of heating for cleaning, heating, Ltd. Dalong Chang respond positively to the call of national policy, high pollution intensity wishing previously used, low thermal efficiency of coal-fired boiler to replace the traditional use hot water boiler clean fuel. After comparing many boiler manufacturers, choosing the optimal selection, determined and professional cooperation parties do fast boiler fuel boiler cleaning equipment. Providing a fast side 35 MW gas tube hot water boiler (SZS35-1.6-Y.Q) according to their actual needs.

Biomass fired:biomass include rice husk , bagasse, mustard stalk, cotton stalk, rice husk, coffee grounds, de-oiled bran, wood chips, roasted chaff, lignite, paper sludge, coal,corn cob, spent grain and so on for a 30 ton circulating fluidized bed 400ton biomass fired boiler colombiause for heating industry.Biomass fired circulating fluidized bed boiler is better than other fuel in energy saving and protecting environment.

SHL Coal Fired Assemble Chain Grate Boiler is the fourth generation of chain grate 400ton biomass fired boiler colombiause for heating industry developed by ZG Boiler, which adopted the latest combustion theory product of Xi'an Jiaotong University. SHL Series Field Assemble Chain Grate Steam Boiler has the features of high power output, high combustion efficiency, stable operation, wide range of overload adjustment, can be adjusted to many kinds of coals and biomass fuels, energy saving, environment-friendly and so on.

What are the matters needing attention in the retrofit of coal-fired 400ton biomass fired boiler colombiause for heating industry?

With the implementation of the new environmental protection law and the introduction of new standards for the control of atmospheric pollution of boilers, the transformation of coal-fired boilers in various localities has been carried out in an orderly manner, and coal-fired boilers can be transformed into natural gas boilers in the actual operation. Can also be transformed into biomass boilers, but no matter how to reform, in addition to the choice of high-quality coal-fired boiler transformation company, but also need to pay special attention to the following matters.

1. When the boiler is dismantled, attention should be paid to shutting down the blower and stopping operation when the boiler is dismantled, and when the furnace temperature drops to an appropriate temperature, the boiler needs to be dismantled by the relevant parts of the existing boiler to be retrofitted to the coal-fired boiler. Stop the boiler induced fan, chain grate, then the workers enter the furnace from the fire door, remove the original furnace arch of the boiler, clean up the furnace interior, and then remove the main engine and auxiliary machinery of the boiler.

2. Attention to furnace reform is one of the key points in coal-fired boiler reform. The combustion conditions of existing boilers can be improved by reasonable transformation, which can not only accord with the combustion conditions of new fuels, but also play a better role in saving energy. However, it involves re-pouring the furnace, so special attention should be paid to keep the back arch pipe of the boiler away from the center of the flame, so that it will not be burned by the high temperature.

3. Attention should be paid to the modified boiler after a series of projects, such as retrofit of coal-fired boiler, pouring of new boiler front arch and back arch, etc., should be paid attention to after the retrofit of coal-fired boiler is carried out. One of the most important tests is to test the boiler body under certain pressure, and the boiler can be put into use only after the boiler has passed the test and revamped. These are a few things to pay attention to when reforming coal-fired boilers.

Related Information