boiler supplier

400ton gas fired steam boiler purchased by turkey

After the gas hot water boiler hot water boiler vaporization emergency 1. Vaporization handler circulating pump stops abnormally pump failure caused by: ① blower stops running immediately. ② immediately open the door, take measures to pressure the fire, lift the chute gate, cutting off the supply of coal grate. ③ In the case of boiler pressure not greater than 0.6MPa (600KPa), the exhaust valve to follow, only a sharp rise in pressure in the boiler deflated, used only relief exceeds 0.9MPa, and the exhaust process to be carried out slowly, prevention boiler due to loss of pressure and more violently again vaporized. ④ close the boiler water, water main gas valve. ⑤ open stop valve recirculation line, to ensure that the water supply pipe velocity convection heating surface (economizer) to prevent re-vaporization of the economizer. ⑥ The operation of the above operation, at the same time to pay the boiler to reduce the boiler water temperature and the furnace pressure. ⑦ After the boiler pressure is normal, i.e., opening the standby circulating pump, into the normal combustion. 2. Treatment failure or sudden loss of power boiler vaporization of power: ① immediately open the door, lift the coal chute slide gate to take pressure fire measures to reduce the oven temperature. ② Grate with the fastest speed in order in the shortest time to fire onto the slag tap. ③ the degree of treatment in the first case. Once a short time can not supply heating network system, antifreeze should take emergency measures. 3. Due to excessive heat boiler boiler vaporization process: ① the immediate closure of the drum, induced draft fan. ② immediately open the door, take measures to pressure the fire, lift the supply of coal chute slide gate, off of coal, while the grate into fast gear. ③ In the case confirmed the presence of water, the boiler can supply water to the boiler body, boiler out of the water while closing the main valve. ④ Open line stop valve recirculation pump to ensure water velocity convection heating surface of the pipe, to prevent the economizer again vaporized. ⑤ Open circulating pump with jog mode, jog each time less than 30 seconds, again less than one minute jog interval. Jog purpose is to reduce the boiler water temperature, while preventing a large amount of steam into the pipeline system. ⑥ back into place after the safety valve, circulating pump running, and then the normal burning stove. 4. Water boiler system run vaporization process due to water loss, loss of pressure caused by: ① immediately closed drum, induced draft fan. ② out of the water while closing the main valve and the boiler circulating pump. ③ take the same measures to cool the furnace tube described above. ④ Open stop valve recirculation line. ⑤ rely exhaust valve until the safety valve back into place. ⑥ until the boiler water temperature drops below 50 ℃, when the temperature of the furnace temperature less number 200 ℃, again within the boiler feed water, water course to be carried out slowly, to prevent harm to the boiler when the temperature is too large. ⑦ After processing leakage fault, the system time to the replenishment, and out of the water boiler always open the valve, and the circulating pump, and then normal combustion.

Recently, the district government Qingyang City, Gansu Province, deputy head of Xifeng Wang Chao organized a remediation coal-fired boilers will promote the work. By the township (street), the head of district straight relevant departments attended the meeting.

Written meeting issued atmospheric district office "notice Leading Group Office of Air Pollution Prevention " About forwarding; Qingyang City, Xifeng Branch is responsible for the ecological environment who informed the progress of the remediation coal-fired boilers, arrangements for the next step remediation work.

Wang Chao requires that all relevant units must concentrate efforts to promote coal-fired boiler renovation, remediation to the control list, in strict accordance with the "three three must" requirements, to promote catch, this area, this system is not in place of coal industry regulation boiler immediately carry out concentration and control, to ensure that the work complete, fully put in place. To collaborate actively cooperate with the township (street) mainly clear time limit for rectification and reform measures, solid progress. To strictly control inventory and remediation remediation standards of accountability and strengthen supervision of the ideological hesitation wait and see, action is delayed, focus on promoting renovation is not complete unit, accountability seriously investigated.

Gas-fired 400ton fired steam boiler purchased by turkey which in modern industrial production, although the boiler very prominent role played by the choice of cleaning agent, but it is also very easy to scale boiler is subject to corrosion or damage. Gas boiler steam heater in such a situation therefore requires timely associated boiler equipment for cleaning, and performance of the practical utility of the most prominent non-gas-steam cleaners which is none other than this. Where a new gas heating system to replace the steam pipe cleaning agent must be used to eliminate the inner wall of debris so as not to affect gas-steam heat transfer efficiency and service life. It should be carefully checked, in use, to prevent water, acid, alkali and leakage into the low boilers using the system, and to install the filtration device, to prevent mechanical debris into the system to ensure the purity of the oil. A gas-steam with hot brands and process requirements, the correct selection of various grades of high-temperature gas-steam, and strictly abide by the provisions of the "organic heat carrier furnace Safety Technology Supervision" in the proper use of gas steam. Gas steam boiler at a high temperature gas for gas steam, gas, fuel furnace as a carrier, electric heating reactor and other heating devices, shall have the expansion tank and the oil sump and other security components and temperature control instruments and other facilities, to ensure safe operation. Purpose cleaners gas steam boiler is effectively rapid clearance gas steam boiler and the heat exchanger internal conduit accumulated soot and grease. Then we also have requirements on the cleaning agent, must not harm our metal heat transfer surface, requiring no residue, is completely dissolved, it must be easy to operate and requires only the use of the process in accordance with the needs of ordinary people to operate. Requires us on the gas boiler steam oven cleaners are: low energy environment, Wudu tasteless, non-flammable, irritation, can be directly discharged after cleaning.

9 fuel 400ton fired steam boiler purchased by turkey plant sharing feature of steam boiler fuel burner set under way, two-pass configuration, the fuel combustion, the boiler operation is stable and take up less space, while the spoiler is inserted smoke tube, slow speed exhaust, the increase change heat, high thermal efficiency, reduce user costs; horizontal oil steam boiler shell type three return all wet back downstream pyrotechnic pipe structure, large combustion flame combustion chamber a slight positive pressure, fully extended, low thermal load combustion, high combustion thermal efficiency, effectively reducing the exhaust gas temperature, energy saving, more economical, and a waveform furnace threaded pipe structure, i.e. increase the strength of the heat absorption of the boiler, but also to meet the needs of thermal expansion of the heating surface, scientific and reasonable and durable. 9 large share of the characteristics of gas steam boiler 1, the appearance of organic combination of mechanical and electrical integration, compact novel, compact structure, occupy less space, easy to transport and install. 2, using the new material and the thermal insulation quality white color plate package, lighter in weight, good insulation properties, beautiful, not rust. 3 burner gas steam boiler is supplied by well-known manufacturers in the world, according to the automatic combustion controller instructions, stop, separate control box has a number of security, safety and stable performance, low maintenance. 4, advanced automatic steam boiler controller, Chinese LCD screen, the man-machine interface, the user simply easily set, i.e., according to user requirements boiler start and stop, load adjustment, automatic water supply, such as automatic operation. Boiler fully functional, complete protection, easy to operate, safe, reliable, self-diagnostic function. Boiler operation anomalies automatically interrupt burning, audible alarm once appeared. 5, gas steam boiler burner set under way, double return configuration, fuel combustion, boiler stable; inserted spoiler smoke tube, smoke slow speed, increase heat transfer, a high thermal efficiency, and reduce cost . 6, gas steam boiler shell type three return all wet back downstream pyrotechnic tube structure, economy. Waveform threaded pipe and furnace structure and improve the strength of heat absorption of the boiler, the heating surface needs thermal expansion. 7, in strict accordance with the present boiler "Steam Boiler Safety Supervision", JB / T10094-2002 "industrial boilers general technical conditions", JB / T1619-2002 "boiler manufacturing technology conditions potshell" requirements, design, manufacture, monitoring inspection to ensure good quality of boilers, achieve low energy consumption, high thermal efficiency, stable pressure, gas and quantity, economic use. 8, a large boiler furnace space, storage, steam and more adaptable load capacity. Rational design of steam separator apparatus built to meet user requirements need to use higher quality steam. Furnace open manhole, head holes, hand holes, to facilitate the internal furnace to clean up, make repairs, maintenance is very convenient.

Related Information