boiler supplier

apa itu lpg automatic boiler

Features electric steam apa itu lpg automatic boiler feed water is heated by electric energy, to obtain the specified parameters (temperature, pressure) of high quality steam plant, having a high temperature under pressure, must be maintained and auxiliary components boiler (steam superheater, economizer, etc.) intact to ensure safe and economic operation. Second, scientific and rational operation of the boiler, an electric steam boiler on various wires to be contacted inevitable, therefore, be sure to check for all electrical wiring and the fastening point before the boiler, comprising a distribution cabinet, the control cabinet. Pump boiler water level gauge, pressure gauge, water level sensor, safety valve should be checked in order to start the boiler after confirmation normal.

Before you run the editing work, the operator must understand the working principle of the apa itu lpg automatic boiler, location, performance and working methods of the various accessories. Check oil combustion, and each nozzle connection, power supply and the burner, the pump, the boiler installation accessory. Clear main steam valve open, after closing the normal close it. Check the water level, water level confirmation flexible, normal position. Correctly setting the pressure regulator, regulate combustion damper.

Problem analysis of the deformation of the heating surface of the steam apa itu lpg automatic boiler 1, the heating surface modification phenomenon a. Waterwall tubes or deformation of the door to see the fire door from the saw, when accompanied by water, can see the red curved water wall tube. B of the horizontal combustion furnace of the boiler, can be seen from the observation hole furnace wall to the fire front side of the deformation. 2. Heating Surface modification of a. Serious boiler water, heating surface of the cooling pot of water had to be thermally deformed. b. poor design structure. The local circulation flow rate is too low, stagnation, that the wall temperature exceeds the allowable temperature deformation. c. Install error, the pressure receiving member is not free to expand. D. substandard quality, thick scale, excessive water residue.

Thirteen Five release plan indicates that China's move towards green development pace firmer, Beijing SASAC Building Materials Service Center from its start, the use of green apa itu lpg automatic boiler heating for low nitrogen as the primary task before the onset of winter. SAC Building Materials authorities after preliminary investigation and after the screening, the other fast boiler R & D experience in the field of boiler cleaning two decades expressed appreciation can, in August 2017 signed a five Thalia T6 series one boiler and two vacuum with fast Boiler condensing gas boiler products contract.

Related Information