boiler supplier

biomass boiler biomass specification for industrial boiler

How much gas 6 tons per hour of steam biomass boiler biomass specification for industrial boilers need? How much natural gas steam boiler needs an hour? 6 tons calorific gas steam boiler 360 million cards, the design pressure of 1.25MPa, the maximum steam temperature 194 degrees, consumption of natural gas per hour at full load boiler 420m3. The above data is only theoretical gas consumption, the actual gas consumption is influenced by many factors. 1, the thermal efficiency of the design; 2, insulation effect; 3, discharge times; 4, fireman professional level; gas and steam boilers are mainstream industrial production equipment. Especially since the implementation of the national coal gas policy, China has not yet biomass boilers and coal-fired boilers appear. Users select the gas-fired most important criteria are reasonably priced, low operating cost, easy to say and difficult choices. What price is only worth buying for key boiler, gas boiler selection is a measure of its quality, how to identify the quality of the boiler? 1, should be sufficient energy, emissions, low emissions; 2, low air consumption; 3, low operating costs; 4, stable; 5, long life; condensing gas boiler advanced design, for flue gas flow reasonable the design optimization. Sufficient heat transfer through the flue gas and smoke tubes economizer, heat the fuel sufficiently. Gas boiler for maximum energy efficiency.

What are the matters needing attention in the retrofit of coal-fired biomass boiler biomass specification for industrial boiler?

With the implementation of the new environmental protection law and the introduction of new standards for the control of atmospheric pollution of boilers, the transformation of coal-fired boilers in various localities has been carried out in an orderly manner, and coal-fired boilers can be transformed into natural gas boilers in the actual operation. Can also be transformed into biomass boilers, but no matter how to reform, in addition to the choice of high-quality coal-fired boiler transformation company, but also need to pay special attention to the following matters.

1. When the boiler is dismantled, attention should be paid to shutting down the blower and stopping operation when the boiler is dismantled, and when the furnace temperature drops to an appropriate temperature, the boiler needs to be dismantled by the relevant parts of the existing boiler to be retrofitted to the coal-fired boiler. Stop the boiler induced fan, chain grate, then the workers enter the furnace from the fire door, remove the original furnace arch of the boiler, clean up the furnace interior, and then remove the main engine and auxiliary machinery of the boiler.

2. Attention to furnace reform is one of the key points in coal-fired boiler reform. The combustion conditions of existing boilers can be improved by reasonable transformation, which can not only accord with the combustion conditions of new fuels, but also play a better role in saving energy. However, it involves re-pouring the furnace, so special attention should be paid to keep the back arch pipe of the boiler away from the center of the flame, so that it will not be burned by the high temperature.

3. Attention should be paid to the modified boiler after a series of projects, such as retrofit of coal-fired boiler, pouring of new boiler front arch and back arch, etc., should be paid attention to after the retrofit of coal-fired boiler is carried out. One of the most important tests is to test the boiler body under certain pressure, and the boiler can be put into use only after the boiler has passed the test and revamped. These are a few things to pay attention to when reforming coal-fired boilers.

The 75 ton biomass fired CFB biomass boiler biomass specification for industrial boiler is a new type boiler with high efficiency and low pollution.This boiler uses Circulating Fluidized Bed burning system, has wide applicability for different coals, like soft coal, anthracite, poor quality coal, lignite, coal mud, biomass and etc. This series boiler product is highly efficient which can reach 95%-99%.So this high efficient biomass fired boiler have wide application in industrial enterprises in Indonesia.

Currently, Yancheng City, Jiangsu Province, has issued the latest "Battle of Yancheng win the blue sky plan", in full swing atmospheric environmental governance. Details are as follows.

First, to promote non-power industry emissions of nitrogen oxides depth and steel industry to implement ultra-low emissions transformation. Achieve before the end of June 2020 discharge standards garbage incineration industry, gas-fired units are encouraged to implement advanced nitrogen removal, implementation of coal-fired units plume of white vapor recovery off the project.

Second, the implementation of total coal consumption control. Accelerate the "Yancheng reduce total coal consumption special action plan", strictly implement the same amount of coal consumption reduction alternative requirements, increase bulk coal remediation efforts for non-electric Yajian coal industry, and gradually increase the proportion of coal. New coal coal project implementation reduction instead. According to focus on the use of coal and clean use of principles, focusing on reduction of non-coal for electricity, the power sector coal consumption accounts for the proportion of total coal consumption to increase more than 65%. Continue to promote alternative energy coal and oil, electricity consumption by 2020 (calculated as the supply of standard coal) accounted for about 55% of the total social energy consumption.

The development of special programs, shutting down vigorously eliminate environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units. Strict control of new coal-fired units installed capacity, the new electricity in the area rely mainly on non-fossil energy generation and transmission to meet outside.

Third, carry out comprehensive improvement of coal-fired boilers. Before the end of 2019, 35 tons of steam / hr and coal-fired boilers or eliminated all clean energy alternative embodiment, suitable remediation in accordance with the principle of the electric power, gas and other appropriate gas is to encourage the use of solar energy, and biomass energy; promote clean coal use, promoting clean and efficient coal-fired boiler, steam 65 t / h coal-fired boilers and more energy-efficient and ultra-low emissions completed transformation; low-nitrogen gas boiler is substantially complete transformation; urban area biomass boilers embodiment ultra low emission transformation; rest boilers with all the special emission limit requirements.

Related Information