What are the matters needing attention in the retrofit of coal-fired biomass boiler with sawdust in sri lanka?

With the implementation of the new environmental protection law and the introduction of new standards for the control of atmospheric pollution of boilers, the transformation of coal-fired boilers in various localities has been carried out in an orderly manner, and coal-fired boilers can be transformed into natural gas boilers in the actual operation. Can also be transformed into biomass boilers, but no matter how to reform, in addition to the choice of high-quality coal-fired boiler transformation company, but also need to pay special attention to the following matters.

1. When the boiler is dismantled, attention should be paid to shutting down the blower and stopping operation when the boiler is dismantled, and when the furnace temperature drops to an appropriate temperature, the boiler needs to be dismantled by the relevant parts of the existing boiler to be retrofitted to the coal-fired boiler. Stop the boiler induced fan, chain grate, then the workers enter the furnace from the fire door, remove the original furnace arch of the boiler, clean up the furnace interior, and then remove the main engine and auxiliary machinery of the boiler.

2. Attention to furnace reform is one of the key points in coal-fired boiler reform. The combustion conditions of existing boilers can be improved by reasonable transformation, which can not only accord with the combustion conditions of new fuels, but also play a better role in saving energy. However, it involves re-pouring the furnace, so special attention should be paid to keep the back arch pipe of the boiler away from the center of the flame, so that it will not be burned by the high temperature.

3. Attention should be paid to the modified boiler after a series of projects, such as retrofit of coal-fired boiler, pouring of new boiler front arch and back arch, etc., should be paid attention to after the retrofit of coal-fired boiler is carried out. One of the most important tests is to test the boiler body under certain pressure, and the boiler can be put into use only after the boiler has passed the test and revamped. These are a few things to pay attention to when reforming coal-fired boilers.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired biomass boiler with sawdust in sri lankas, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.

Where gas biomass boiler with sawdust in sri lanka Fortunately, than coal-fired boilers? While some provinces there is a problem of gas shortage, but to understand China's current gas pipeline network construction planning of people are not too worried, after all, "less gas" is our long-term lack of reserves caused only boiler from coal to gas pushed forward one only. For customers not to buy gas boiler, may consider other clean energy boiler equipment, such as gas boilers, boiler methanol, biomass boilers, etc., there is something to meet demand; customers only purchase natural gas boiler, if production applications, the current provinces have issued relevant policies, "Paul production" is one of the measures the country, it can only be supplied only for heating.

The CFB biomass boiler with sawdust in sri lanka is a new type boiler with high efficiency and low pollution.This boiler uses Circling Fluidized Bed burning system, has wide applicability for different coals, like soft coal, anthracite, poor quality coal, lignite, coal mud, biomass and etc... This highly efficient series boiler product is (can reach 95-99%) energy-saving and environmentally-friendly.