boiler supplier

biomass steam palm oil boiler

In mid-November, Langfang City, Hebei Province continue to promote coal-fired biomass steam palm boiler pollution problem, do the atmospheric release 2018 Fourth supervision order, supervision order states: the country, relevant departments directly under the city's control to quickly take a series of measures to prevent and strictly control burning coal boiler pollution problems.

Now is the time winter heating season, but also the critical period of the comprehensive management of air pollution in the autumn and winter season, the coal-fired heating boiler emissions standards are the focus of Langfang City, air pollution prevention and control. To ensure that coal-fired heating to achieve effective control, reduce emissions, minimize the adverse effects on air quality, atmospheric Langfang City Office will join together to focus, determined to win the battle in autumn and winter air pollution of coal-fired boilers.

Steering proposed order, the relevant departments to combine their job requirements for environmental protection, to develop a coal-fired boiler heating energy saving solutions for special work, establish special supervision and inspection mechanism for all heating stations in the main city within the city limits, supervision and guidance heat stand while ensuring a stable discharge standards, to protect people spend a warm winter. Various environmental protection departments will strengthen the tracking and monitoring of emissions of various heating stations, to be serious penalties for excessive emissions of coal-fired boilers, but also will continue to maintain compliance or below the City heating boilers requirements set emission standards for reward and subsidies .

Dry: six gas-fired biomass steam palm boiler safety procedures (hot water + steam) stage, the purchase of gas-fired boiler more and more users, in many industries, such as oil exploration, hospital disinfection, chemical production, wine feed, and so on. But many users initial contact with a gas boiler told us how to get started quickly boiler operation is not clear. First, all personnel must be familiar with the operation of the boiler boiler performance and safety knowledge, certificates; this non-job employees Never operate. Duty personnel should strictly follow the regulations, do a good job operating records and shift recording, the security situation should shift equipment and run tests, carried out. When the shift to check the boiler is intact. Second, purchasing, installing, or before the initial operation of the boiler, the boiler and safety accessories must conduct a comprehensive inspection, inspection and determined within the validity period to start. Third, Kai furnace ready to check the gas pressure is within the normal range of values, not too high or too low; check whether normal pump Sheung Shui, if unusual you need to open the purge valve until the Sheung Shui so far. Open the door of each section Water Supply System (including Sheung Shui before and after the festival gates pumps and boilers); check the water level, the water level should be in the normal position, the water level gauge, a water color need to plug in the open position, to prevent false water level, if missing water can be manually Sheung; check valves on the pressure pipe, must be opened, the wind deflector must all flue opening; each knob inspection control cabinet are in their normal position; steam boiler check valve is in the normally closed state, heat water boiler circulating pump outlet valve should be turned off; check water softening equipment is operating correctly, soft indicators of compliance with national standards. Fourth, Kai furnace run time 1, steam boilers Open the power to start the burner; check manholes, hand holes around the flange and valve leaks will be tightened, if there is still leakage after tightening occurs, you need to immediately stop maintenance furnace; l when the air pressure 0.05 ~ 0.1MPa, replenishment, sewage, water supply systems and sewage screening test device while flushing water table; when the pressure was raised to 0.1 ~ 0.15MPa, rinsed trap gauge; pressure was raised to 0.3 MPa, the "fire load / small fire" knob to "fire" to strengthen the combustion; 2/3 when the air pressure was raised to the operating pressure, start warming air supply tube, slowly open the main steam valve, to avoid water hammer; out when the drain valve when steam is completely close it; after all drain valve closed, slowly open the main valve to open, and then half a turn; "burner control" knob to "Auto"; level adjustment: adjusting the water level (according to the load manually when to start and stop the pump), low load level should be slightly higher than the normal level, high load level should be slightly lower than the normal level; steam pressure adjustment: adjusting the combustion load in accordance with (manual adjustment fire / small fire) determines combustion conditions The flame color, smoke color determination condition atomisation air quantity and exhaust gas temperature observed concentration chimney, the best change in the combustion temperature to be adjusted according to the combustion. 2, start the circulation pump hot water boiler; startup burner; 15 minutes after start, "" fire load / small fire "spin-bit color button to" fire ";." Burner control "knob to" Auto "five, normal stop 1 furnace, hot water boilers' fire load / small fire "knob to" small fire "; off the burner; close the fuel supply valve; closing dampers; boiler after the temperature dropped to 50 ℃, the pump outlet valve closing cycle ; .2 circulation pump is stopped, the position of the steam boiler "fire load / small fire"; Close combustor; steam pressure drop when the sewage to 0.05-0.1MPA; closing the main steam valve; manual replenishment to the higher level; Close valve; Close supply valve combustion; closed dampers; six off the main power, an emergency shutdown, the steam boiler main steam valve closed; off the main power; 2, boiler water boiler inlet and outlet valve closed; opening the emergency valve and the emergency discharge replenishment valve; off the main power switch; notification superiors.

Steam Gas Gas Desulfurization to achieve excellent results steam oven gas steam oven must sample tests, the thermal conductivity was measured quality of appearance, flash point, viscosity, acid, water, and carbon residue, provided with heat transfer fluids plant proof mass It is consistent with the book, but also provide the basis for future changes in the operation of medium quality monitoring. Means passing the tests of the gas-steam heat transfer fluids using pumps to transfer fluids within the furnace and the injection of hot expander. When pumps heat transfer fluid to the injection system, should check again the furnace, heating equipment, piping system drain valve, drain valve is closed, in order to avoid loss of heat transfer fluids. While the exhaust pipe and the valve opening on the furnace one by one, to exclude air, until a closed gas steam flows. It stops when the oil level gauge appears on the expander injection heat transfer fluids, and then start the circulation pump, for circulating cold. Existing gas steam oven dry dust, do not meet wet desulphurization process of flue gas CWS humidity, water vapor in the flue gas as coal-water slurry up to 36%, some as high as 40% or more water content of coal-water slurry, If we consider only the dust and sulfur dioxide that is not enough. Arts gas steam biomass steam palm boiler company after multi-party experts to study, test, develop a dusting product, the successful use of coal-water slurry plenty of water in the flue gas as a carrier, by cooling, reducing condensation, dust and sulfur dioxide capture down, to achieve excellent results gas desulfurization steam oven. The effect of dust reaching the user's satisfaction. Gas welding gas steam oven must be operated by welders holding boiler and pressure vessel certification of welders. Welding dimensions meet the design drawings and process documents, bead height is not less than the base material, the base material with a smooth transition. Gas fuel gas steam oven weld and heat affected zone no cracks, holes, craters and slag. Weld undercut hole deeper than 0.5mm, the total length (the sum of both) is not more than 1/4 of the circumference of the tube, and not more than 40mm. Construction of gas steam oven strict compliance with welding procedures and other relevant standards and regulations, and make construction records welded to record the record.

A, WNS series automatic fuel (gas) steam biomass steam palm boiler 1, an internal combustion boiler using a horizontal double quick return smoke wet back structure, the body-mounted using the waveform furnace, combustion chamber and back to the waveform furnace, connected to threaded pipe. After exotherm temperature flue gas flame in the furnace, carried to the threaded pipe via the folded back to the combustion chamber to the convection heat before entering the smoke chamber; high temperature flue gas enters the condenser back energy, the heat transfer by sufficiently by chimney into the atmosphere. 2, for a variety of boiler fuel oil, natural gas fuel, city gas or liquefied petroleum gas. 3, the boiler before the smoke box with movable lid cigarette, demolition, convenient rear access. Boiler with integrated burner, has started fast, high efficiency, high degree of automation features, the need to provide for a variety of local life, civil and industrial steam. 4, a boiler with full instrumentation system valve, the valve body has a boiler inlet valve, check valve, the main steam valve, safety valve, drain valve, air valve and the combustor brought solenoid valve. Water meter with a measuring point pressure display, display and control drum pressure, exhaust gas temperature display, the temperature and pressure of the burner is displayed. 5, combustion and boiler feed water using automatic control, automatic adjustment, easy operation, low labor intensity and safe and reliable protection devices, easy maintenance and repair.

Related Information