blind coal coal fired steam boiler

Well designed and optimized the small series main parameters of blind coal coal fired steam boiler maintenance check before delivery of submersible pumps confirm Henan fast boiler us with all the main parameters of the steam boiler optimization design and delivery of well maintenance check before confirming with submersible pumps steam boiler with other boiler Like products, in order to improve the combustion efficiency of the boiler must optimize the product, this article lists the following items index to optimize the design parameters and performance indicators as steam hot water boiler for reference purposes only. (1) to ensure safe operation of the hot water boiler steam: hot water boiler steam integral part life more than 30 years, the life by wear of the heating surface reaches more than 15 years. (2) Operation Economy excellent hot water boiler steam: Steam hot water boiler efficiency of 91% -93%, 99% combustion efficiency; small soda system flow resistance, reducing the power consumption of the feed pump; reduced gas side resistance losses, reducing blower, fan, and other auxiliary equipment mill power consumption. (3) has a good regulation performance: adjusting the combustion, steam temperature adjustment, like the boiler drum water level regulator flexible and effective. (4) investment cost savings: Enhanced heat transfer, reduce the consumption of metal, especially a reduction in the consumption of advanced metallic materials; under the premise of ensuring product quality, reduce manufacturing, transportation, construction and maintenance, operating costs. (5) High Reliability Run: available more than 90%, fewer unplanned downtime; fire, deflagration, and no accident slagging operation of the steam boiler hot water; heating surface leakage and over-temperature occurs, tube rupture. (6) has a good load following properties: rapid start and stop, load change quickly. (7) running stability: stable operation of the steam boiler parameters, thermal stress is small and easy to adjust automatically with coal and load changes. (8) slight heating surface wear, less fouling, corrosion, emissions meet environmental requirements. Check well before delivery inspection confirmed ① out with submersible well pumps, valves, and pre-population with submersible pumps line valve closed; ② confirmed wells with submersible pump inlet line valve closed temporary purged with nitrogen, removal of temporary hose, cap installed; ③ confirmation discharge line valve closed torch; ④ confirm the submersible well pump has been fully emptied medium (neat) with; ⑤ discharge line to confirm a closed valve closed; ⑥ confirmed vent valve opening (Ming row); ⑦ confirm submersible well pump body temperature was lowered to room temperature; ⑧ contact operating position within the pump power corresponding to the apparatus; ⑨ card to send electrical power plant, the pump power; ⑩ confirm that the pump motor off.

Our Client from Russia, visited our factory, the boiler manufacturing line. Considering their snack food factory daily steam requirements and rice corn cob biomass fuel advantages, our engineer recommended 4 ton DZL series biomass boiler for him. DZL series biomass boiler, can burn coal fuel and biomass fuel together. This can save fuels costs, and enhance boiler thermal effect. Another feature is DZL series structure, the packaged boiler is easy to ship, small land occupation. We reach an agreements to delivery this boiler in 45 days after receiving the order payments. We can delivery this boiler by load or by sea into Russia. Its is a kind of chain grate boiler, running biomass fuels into its chamber by chain grate. In our company, coal and biomass boiler thermal transferring efficiency can reach 85%.

Meanwhile, the party also fast boiler design automation control systems, temperature, pressure, and other parameters automatically adjust the water level, real-time monitoring anti-smoke temperature, oxygen content and changes in safety interlock, even if unattended, the boiler can function . In mid-January 2019, under the fast boiler joint efforts of all staff, boiler manufacturing is completed, the pipeline project has reached Hwashi ground, and successfully complete the installation and commissioning work. At present, the boiler has been put into the urban underground pipeline construction and maintenance projects in order to contribute to building a better city.

Boiler startup startup boiler combustion adjustment method should pay attention to the flame monitoring, combustion and make adjustments as follows: (1) correct the ignition. Adequate ventilation furnace before ignition, the ignition first investment ignition device (or torch), then turn the gun. (2) diagonally administered fire mouth, pay attention to timely switch, the flash point was observed nozzle suitable fire, flame sought uniformly distributed in the furnace. (3) to adjust the lead note, air volume, furnace pressure should not be too large. (4) in particular to monitor exhaust gas temperature when combustion instability, the occurrence of the back pass to prevent the secondary combustion. (5) to maximize the temperature of primary air, secondary air is fed reasonable depending on the fuel. Adjusting the temperature difference between both sides of the cigarette. Do pulverizing system-OFF stable (6) operation. Stoker coal under stable powder machine speed and stability. Coal with wind stability and oxygen stable. Steam temperature, steam pressure increase stability and load stability liter.

Related Information