boiler supplier

boiler steam generator China

2800KW YLW series chain grate thermal oil heater for food industry

In the food industry, efficient and energy-saving boiler systems are of vital importance to enterprises and will directly affect their economic benefits. Based on market analysis, Xuanwei Wotu Agricultural Development Co., Ltd. decided to implement a potato deep processing project in Yunnan. As an important piece of heat source equipment for this project, the ZOZEN YLW series thermail fluid heater and matching steam generator ensure a stable and sufficient steam supply for potato deep processing production lines.

Xiamen Rui Yi Hotel is available straight left Gulangyu the most beautiful views of the BRIC countries delegations designated top hotels, the best location in the heart of Xiamen, modern trends and classic style pavilions. The hotel features well-appointed room service, fashion and superior restaurant, bar, meeting rooms and a gym, swimming pool and other recreational facilities, people feel contented and comfortable. Projects and programs as Xiamen Rui Yi Hotel Xiamen City landmark hotel building, attaches great importance to environmental protection philosophy, which party fast boiler manufacturing philosophy coincide. In late 2016, the two sides signed an electric steam boilers for hotel supplies disinfection work, since the electric steam boiler, any security incidents never happened, Rui Yi Hotel ensure normal operation.

Rated evaporation gas steam boiler rated evaporation to choose the size of the boiler steam boiler is a proper noun, which is the power of steam boilers. Calculated: (ton unit) the general power boiler steam generator chinas are rated by evaporation. Rated evaporation is a boiler to heat water per hour becomes steam production. This is the main argument when we need to consider the selection of steam boilers. How to choose the right Rated evaporation it? Generally, we first calculate the own use of steam per hour required, if the hotel laundry room and hospital disinfection equipment, you can see through the steam parameters parameters to calculate laundry facilities needed for every hour; if it is the plant process steam then it can be calculated per hour of steam required by the process. After calculating their required amount of steam we can choose the boiler, and generally we need to select the rated evaporation than we calculate the steam boiler with 20% of the amount. Because there may be some cases in the actual use of the process to increase the amount of steam, or steam boiler does not reach its ideal operating conditions. Here should be noted that, in accordance with our steam boilers are marked on the boiler rated pressure to calculate the rated evaporation, and some foreign steam boiler is zero pressure steam production to the subject. Such as poly rated pressure force is 1.0Mpa steam boiler, the steam temperature is 184 deg.] C to produce, while the zero pressure steam production refers to the production of steam output of 100 deg.] C, to the middle of the big difference.

1. The pressure test the electrical components of the electrical boiler steam generator china if the steam generator is completely assembled (i.e., as good as the boiler and the header connecting pipe, tube, heating the surface of the assembly line and the like). Header pressure test and assembly line can not, if they have been made in the component parts and hydraulic test or an ultrasound test of 100%, or other non-invasive test similar words. Upon completion of the processing of these components assembled, pressure is applied to test weld inspection no damage (radiation or ultrasound) to the full-length flaw detection. 2. All of the tubes, welded, cast, shaped parts and components, not all of the processing done in the hydrostatic test steel. Said component members of the hydrostatic test is not necessary, if they have done 100% ultrasonic testing or other similar NDT inspection. Superheater and economizer; while allowing the individual parts and components subjected to the hydraulic test in combination together with the electric boiler, not separate discrete electrical steam generator installation if reprocessing or hydrostatic test words. Included in the scope of the hydrostatic test all of the electrical steam generator, superheater, economizer, steam generation and processing power of the finished part. After working on the fixed plant boiler, is delivered to the sub-mounting parts, components, assemblies dispersion transportation, so the installation must be pressure test. Hydrostatic test purpose is to check electrical steam generator, superheater, economizer all density and strength member, all other members must also be welded hydrostatic test.

Related Information