boiler supplier

boilers 100 kg to 15 tons capacity

Commonly used during the period of the Shutdown of food plants Maintenance Shutdown of the food factory maintenance methods, known from the time of the shutdown cause of corrosion, corrosion can not do without oxygen and water boilers 100 kg to 15 tons capacitys, so to do the maintenance shutdown, the need prevent oxygen to enter and work hard to keep dry. 1, the dry maintenance Dry maintenance primarily by placing a desiccant or a particular gas or the like charged into the boiler water-side holding metal sulfate or preventing the entry of air maintenance method for long-term maintenance shutdown. Commonly used methods desiccant method and inflation method. 1.1, desiccant process. Disable the boiler, the furnace was naturally cooled to be started when the drain 100 deg.] C, using residual heat boiler for drying. Each valve opens and the inspection hole, remove scale furnace, ash and the like. Open containers with a desiccant, arranged along the longitudinal direction of the drum is placed. To determine the amount of desiccant in accordance with the volume of the boiler. To lime, the amount is generally 1m3 boiler is 3 ~ 5kg. Desiccant been placed to be close all valves to prevent moist ambient air from entering. After the boiler to be regularly checked, when found in the case of a desiccant appear consolidation and deterioration should be replaced immediately, usually 15d to be replaced once a month. 1.2, inflation method. After draining water boiler, ammonia gas or nitrogen gas charged into the boiler, to displace the oxygen and water vapor in the furnace, the furnace pressure was sealed and maintained at 0.05 ~ 0.1MPa, prevent outside air into the pot, to achieve the anti-corrosion purpose. This method is simple, reliable, universally applicable to all kinds of boiler structures.

Gas hot water boilers 100 kg to 15 tons capacity how to install the pipeline? Gas hot water boiler at the time of installation, each necessary piping is unavoidable, then the gas hot water boiler how to install the pipeline? Here Xiaobian take you to do a simple understanding. Installation of pipelines, with the overall aim is to secure smooth operation of the boiler, so the point is also to take into account more and more. First, the hot water pipe installation, the installation is performed, no doubt when taking into account the flow of hot water boilers, and try to achieve its consistent In addition, a certain slope, the other in this process, but also noted that the exhaust valve , and set the relative position of the trap, to ensure understanding between the three mating, secondly, to install water pipes, its purpose is to facilitate the installation of boiler feed water, taking into account its installation location should be below the heating pipes , and also noted that the device which is preferably located at one end of takeover. In addition, installation of sewage pipes, during its installation, taking into account its role is immediately removed boiler combustion impurities, so try to set up a small corner, to avoid the accumulation of impurities caused by the phenomenon here, long-term treatment is not timely bombing phenomenon. In addition, in terms of gas boilers, and gas pipelines, gas pipeline installation, must take into account the position of the point of ignition, rational distribution, in this process, but also to minimize the bend. In short, reasonable co-standardized layout of the pipeline, not only have a certain effect on the safe operation of the gas hot water boiler; the same time, you can also improve the operating efficiency of the boiler to a certain extent.

What price the tonnage of 6 tons of horizontal steam boilers 100 kg to 15 tons capacity steam boiler WNS are generally concentrated in small tonnage, are generally concentrated in the 10 tons of the majority. The main structure is caused by the boiler. Therefore, the general corporate purchasing wns types of boilers are to meet production. Recently there fast boiler consulting business to what the price of 6 tons of steam boilers, this is the case, will be better budgeting boiler procurement. In this regard, fast boiler for the production of situation is a detailed understanding. After understanding the business use 6 tons WNS steam boiler to meet production. Currently, the types of boilers in the fast side of the price at 720,000.

Shunde main business of special sea oil production and processing, etc., in the course of special oil refining, a large amount of steam required for oil and gas extraction, distillation and extraction technology and other aspects, therefore, the boilers 100 kg to 15 tons capacity is supplied special sea oil processing technology company Shunde indispensable less equipment. As environmental policy progresses, the chemical industry as more polluting industries are highly valued the various departments of quality supervision, sea Shunde companies to follow the development of the State Environmental Protection pace, choose clean the boiler industry-leading fast Boiler cooperation with the parties by quickly assess the specific needs on-site estimates and sea Shunde, to provide a SZS series of 25 tons of steam water tube steam boiler (SZS25-2.0-YQ).

Related Information