coking waste heat boiler header

Fangkuai Group adopts the concept of “moulding character and creating high-quality products”, and continues to research and continuously improve the technological content of products to get closer to users. With the mission of “creating convenient and fast coking waste heat boiler header high-quality products for users”, it uses remote monitoring, APP, and active return visits. And other channels to provide users with convenient and efficient services; with the core values of "professionalism, lean work" as the core value, established an effective enterprise management system, adopted ISO9001 quality management system, OHSA18001 occupational health and safety management system and ISO14001 environmental management System certification; and cultivated a large number of high-quality employees with norms of behavior, professionalism, and continuous commitment to provide customers with more convenient and efficient services.

Small gas hot water coking waste heat boiler header requirements introduced 1, small boilers and normal hot water boiler should be installed at least a pressure gauge. Pressure gauge check should be carried out in accordance with relevant regulations. There are two small soda boiler, small steam boilers and small aluminum boiler should at least also installed a water gauge. 2, soft drinks dual small boilers, boiler pressure boiler can not be small with spring-loaded safety valve, seal safety device should be used meets the following requirements: the diameter (1) should be determined according to the dip pipe and pressure rated capacity of the boiler, and an inner diameter not less than 25 mm; (2) seal device is mounted, the effective height of not more than 4 meters water column and only allows negative deviation; shall be installed on any valve (3) seal the pipe, and measures should be frozen master. 3, small soft drinks dual boiler should annually conduct a pressure test. 4, small steam boiler should be conducted every two years external inspection and hydrostatic test. 5, small steam boiler lifespan should not exceed eight years, more than eight years be scrapped. 6, small aluminum pressure hydraulic test should be conducted every two years. Prior to hydrostatic testing should be performed to check the necessary internal and external. 7, after pressure hot water boiler in use, and no unit or person shall not change the structure and installation of boiler system piping, valves. Non-pressure hot water boiler converted boiler pressure.

Boiler management system

In the process of boiler operation, there are some management systems, which need to be obeyed by all of us in order to obtain good management effect, so as to effectively manage the boiler, reduce the probability of failure and improve the work efficiency of the boiler. Today the editor summarized it for everyone.

Internal treatmentis the conditioning of impurities within the coking waste heat boiler header system. The reactions occur either in the feed lines or in the boiler proper. Internal treatment may be used alone or in conjunction with external treatment. Its purpose is to properly react with feed water hardness, condition sludge, scavenge oxygen and prevent boiler water foaming.

Related Information