boiler supplier

community oil boiler supplier

Fast community boiler supplier is a very trustworthy business, whether it is the beginning of cooperation or boiler put into operation, such as a party soon have maintained cooperative attitude, patience, careful. To ensure long-term stability of the latter part of the boiler operation, fast boiler technician fireman's gave us a free people to do the training, precautions and reduce the accident rate method full guidance boiler operation. --customer feedback

Oil and gas community boiler suppliers for school heating

Entering the end of November, China's north has ushered in a new round of cooling. But the students at Zhengzhou University did not feel the cold. Because the school has started heating work. CBM 's oil and gas heating boilers have begun to play a role in the campus of Zhengzhou University, sending warmth to the students.

Image gas community boiler supplier (4) of the fan impeller, air guns fire tube, damper controller, damper baffle, a cam adjusting mechanism diffuser plate. 2, the ignition system functions in that the ignition system ignites a mixture of air and fuel, its main components are: the ignition transformer, the ignition electrode, a high voltage electrical cable fire. A more secure electronic ignition system called ignition pulse, is widely used Zhuoyi energy saving gas boiler manufacturers. Which facilitate saving, can simply press a finger, and safe, does not occur due to unexpected accidents occur flame, once the stall state occurs, the control system can close the solenoid valve, off the gas passage. 3, system monitoring function monitoring system is to ensure that the burner safe and stable operation, the main components are flame detectors, pressure monitor, temperature monitor (see below) and the like. 4, functions of the fuel system of the fuel system is to ensure that the desired fuel burner. The fuel oil burner system are: tubing and fittings, pumps, solenoid valves, nozzles, heavy oil preheater. The gas burner mainly a filter, pressure regulator, solenoid valve, and then firing solenoid valve, the fuel valve. 5, electronic control system electronic control system command center and the focal the above system, the primary control element is a control box, for different burners with different programmable devices, the common programmer has: lfl series, LAL series, loa series, LGB series, the main difference is the time of each different program steps. The controller 1, ultra Encyclopedia Chinese LCD display, built-in luminous incandescent lamp, regardless of the day night, the screen clearly visible. 2, the image level animation display state, condition, valve status, alarm status, operation of the boiler at a glance. 3, cpu intelligent central processor, all the programs focused on a digital chip, scalability, high degree of automation, simple, and powerful. 4, includes a time setting, temperature setting, setting valve, a continuous setting, timer setting, and other control functions pressure setting, arbitrarily set the working state.

How to prevent running back pass secondary combustion 1, 30% of the rated community boiler supplier to deal with the amount of purge air before boiler ignition; the boiler must be 30% of rated air flow purge less than 5 minutes after the boiler fire, or allowed to boiler re-ignition. 2, fine-tuning the boiler and combustion systems pulverizing system operating conditions, to prevent incomplete combustion of oil and coal accumulating on the tail heating surface or flue. 3, boiler burning oil, adjust the proper air flow, fuel flow, confirming good gun oil spray, burning completely. If you find a bad oil spray gun should be discontinued immediately, and clean up. 4, when the oil application group administered powder, cast powder should be confirmed before the oil burner ignition good, or allowed to cast powder. 5, the oil powder boiler during cofiring, and check the fuel oil gun system of fire reinforcement. 6, normal operation, operation personnel in monitoring the economizer, an air preheater flue tobacco in different conditions of temperature, abnormal, should be checked to detect a fire-place. 7, air preheater sootblowing steam system normally put into operation, the soot-blowing pressure and temperature in a predetermined range. When the unit load or less prolonged 300MW kerosene mixed combustion, air preheater sootblowing steam to be continuous. 8, the air preheater into a reliable fire alarm device. 9, an air preheater inlet and outlet fume / air damper, and should be able to put an electric shutter can be open, closed tight. 10, if found preheater stall, should be put into operation again immediately, if not turn back, they should be isolated.

Related Information