boiler supplier

describe steam boiler firetube and watertube

Steam boiler heat loss is what causes? Steam boiler heat loss caused to the user a lot of burden, whether it is hot describe steam boiler firetube and watertube what is causing the loss of it? To analyze together with you today. Specific causes heat loss of the steam boiler at several: 1: heat loss of exhaust energy: smoke exhaust gas boiler comprises means losses are not completely absorbed by the steam heat loss. How caused? Short distance high temperature flue gas fan suction force is too high, the high temperature flue gas immediately excluded from the boiler; a small heating area, high temperature flue gas boiler can not be sufficiently absorbed. 2: the fuel gas does not completely heat loss: the combustible gas discharged from the flue gas generated in a boiler, the fuel in the combustible gas or gaseous fuel combustion process itself does not contain all of the incomplete combustion releases heat losses arising. As the incomplete combustion of carbon monoxide and carbon dioxide containing off-gas produced by combustion compared to the complete, only a quarter of the amount of heat released. 3: Solid incomplete combustion heat loss: refers to the solid fuel combustion process as a fuel grate down the drain does not release the heat of the flammable substance and ash contained in the combustion of the fuel can not completely burned released heat loss caused. 4: Loss steam boiler Grate: refers to the internal heat loss of the absorbent. 5: high temperature heat loss: Indicates high water temperature and hot water temperature, heat loss. 6: heat loss in steam boiler pipes caused by furring.

That is, the number of hotel rooms and heating area of ​​the first consideration, the number of rooms determines the water, boiler size selection every day, mainly from the two parts. Heating part of the general design per square 80-100W, such as the hotel area of ​​1,000 square feet, it is the power required for heating the gas boiler portion 80KW-100KW; the water portion of the number of rooms, is calculated using a peak at the hotel while hot, hot water boiler heating generated as long as the use of the hotel to meet the peak hot water. 100 such as hotel rooms, in general, while the hotel bathing water is 30% of the total amount, i.e. 30 rooms simultaneously hot water, calculated per 100L, the maximum peak 3 tons, the boiler power is calculated for 3 tons per hour how much heat the water needs to be, because a similar hotel, bath center of these large water commercial establishments, the general design of the proposed installation will open about 10 tons of stainless steel water tank, low-power boiler slowly heated hot water tank, saving early investment in equipment cost, and can ensure all-day hot water usage, best of both worlds.

SZS series boiler in Nigeria

Recently, boilers produced by were exported to foreign countries. This time, zg provided a 15-ton SZS series steam boiler to a company in Nigeria.

In the square, accompanied by Mr.?Mahbubul fast group of professional boiler foreign trade, the group visited two intelligent production workshop, national R & D center and a full laboratory conditions has been the recognition and appreciation Mr.?Mahbubul. Not only is our company's hardware conditions attracted Mr.?Mahbubul, results in the software also lets Mr.?Mahbubul Gee praised. Mr. Mahbubul it comes to the process of communicating with us, the boiler can not guarantee the purchase of multinational concerns about the safe operation of the boiler; and our unique remote monitoring cloud service system is just perfect solution to this problem.

Related Information