boiler supplier

electric 100kw hot water boiler

General Electric electric 100kw hot water boilers 1--2 years, to a certain degree of repair and maintenance, which helps the proper functioning of the electric boiler, regular maintenance for electric boilers but also to protect the basic conditions for its normal operation. 1, boiler maintenance, care must be taken: cut off the power supply, carry out relief. 2, the burner should average every two months removed from the boiler, carefully remove foreign bodies such as dust and soot. Photocell light-receiving surface wipe once a month on average, fuel filter should always be kept clean and good filtering; carefully clean the filter inside the oil pump Note: Do not break the seal. Oil-burner not idle, so as not to pump damage. 3, the water level gauge should always be kept clean, rinse the purge valve is opened, the water level in order to ensure a clear day. 4, pulling the safety valve once a day, to prevent rusting failure. 5, after the completion of repair work, checking tools, materials, accessories are complete, to prevent these and other accessories left in the furnace space.

More details gas electric 100kw hot water boilers should be promptly after use as a steam boiler plant drainage, heating, bath with gas boiler is a kind of fuel for the gas equipment (fuel gas-fired boilers), because it is compared with oil-fired boiler, electric boiler up more economical, which is widely used. After carrying out the gas boiler must turn on the water to be disabled. Why is that? We will come and detailed discussion about this issue today. To turn on the water when the gas boiler is disabled: gas boiler in the boiler water if the winter will put the cracking, there will be odor and summer long embroidered, so that the life of the boiler will be reduced. At the bottom of the boiler there is a turn on the water with the section of the door, then opened, gas boiler pipes in the water will flow back to the boiler, the boiler is done and the water on it. Water level controller SZB-IV (electrode type water level alarm) 1. When the normal level of + 30mm, pump control switch contacts are open, the pump stops working. 2. When the normal water level -30mm, pump control switch contacts in contact, the pump starts to work. 3. When the normal water level of + 50mm, a first group of electromagnets high gas boiler water level contacts the combined output high level alarm signal. 4. When the normal water level of the gas boiler -50mm, a second group of electromagnets in conjunction with the low water contact output low water level alarm signal.

Gas electric 100kw hot water boiler szs 1 emergency shutdown procedures, if necessary emergency shutdown generally, when the boiler encounters one of the following, operation should be stopped in case of emergency; (1) allow the boiler steam pressure exceeds a safe pressure, fueling is stopped strengthen water supply, measures the wind pressure continues to rise. (2) boiler severe water shortages. Water meter can not see the water level. After being called water, the water level of sight. (3) When the severe water boilers, boiler water level is higher than the highest water level is visible, but the emission level not yet seen. (4) increase in boiler water, take other measures, the water level will continue to decline. (5) water supply device is turned off, standby equipment. (6) all water level gauge or invalid. (7) All the safety valve all the failures. (8) All all-off failure drain valve. (9) causing damage to the boiler pressure element (e.g., boiler tubes, etc.), or endanger the safety of the device. (10) boiler is a serious threat to other events and safety equipment. 2, natural gas boiler operation method szs immediate emergency stop operation of the controller, the boiler is off, closing the front of the boiler gas valve to stop the gas supply. The steam boiler competent completely separated, opening the exhaust air valve or safety valve steam pressure. Due to lack of water, the boiler is not allowed into the boiler, the steam is not discharged to reduce pressure. No shortage of water, cold water can drain down alternate method, the water level remains complete accident should immediately stop the water supply, water reducing combustion (fire artificially changed into a small fire), play an open valve while opening the main steam pipe and the drain valve cylinder to prevent the steam to carry large amounts of water, water. In the shutdown process, the cooling rate of the furnace should not be too fast to avoid flue compression member and the expander is damaged suddenly cooled. 3, emergency shutdown processing method szs natural gas boiler in the case of emergency shutdown, due to the nature of the accident, the following may take a different approach: (1) rapid flame treatment emergency shutdown, the burner first station, and closing the valve flame gas supply is stopped after the cut valve, to maintain the water level is normal. (2) rapidly cooling the furnace or water if there is no water leakage during an emergency stop, the cooling time can be shortened to the boiler water and sanitation and reduce the pressure. When the boiler water temperature down to 80 degrees Celsius, boiler water can be discharged. If the boiler severe water shortages, the boiler can not cool quickly in the event of an outage. Non-water to the furnace, or explode. accident. (B) natural gas boiler shutdown SZS normal shutdown (complete shutdown, shutdown maintenance) procedures which can be used when needed repair or stop steam boiler. 1. If one of these faults, the leaders agreed, the boiler can be temporarily closed repair: bilge faucets, riveted joints leak, damaged tubes, the waterwall tubes, the heating tube, the flue gas contacts the drum, the head, off pipe insulation, water supply system, combustion system, a serious fail-safe accessories, in need of repair. 2, a temporary repair (or normal shutdown) the method of operation in order to stop the burner, for closing the valve. Boiler feed water to 2cm above the normal water level, to stop water supply, reduce the pressure. 3. Turn the main steam valve, open the traps, and steam boiler operation, reliable water separator. 4, boiler feed water close electric valve and manual valve, boiler feedwater reliable cutting. When the steam pressure drops to zero, the water can be supplied and discharged alternately, so that water is gradually cooled furnace, when the temperature drops to 50 degrees Celsius (or hand potshell touch feeling hot pan head), can be completely discharging furnace boiler water water . Before water, open the air valve on the boiler or lift safety valve. At this point, you can enter the furnace for inspection and repair. Cooling the furnace must be kept slow, non-violent cooling and damage to the boiler, the boiler can be stopped from the repair into the furnace, the cooling time is generally less than 24 hours. Close the furnace over 24 hours, shut off the gas supply valve at the regulator, and open the gas conduit pipe is responsible, in the exhaust gas pipeline.

Fast electric 100kw hot water boiler is a very trustworthy business, whether it is the beginning of cooperation or boiler put into operation, such as a party soon have maintained cooperative attitude, patience, careful. To ensure long-term stability of the latter part of the boiler operation, fast boiler technician fireman's gave us a free people to do the training, precautions and reduce the accident rate method full guidance boiler operation. --customer feedback

Related Information