boiler supplier

electric boilers for underfloor heating and hot water

In recent years, the state environmental protection is all the more attention we as a company with the times, in order to respond positively to the implementation of the national environmental protection requirements from coal to gas project. But the choice of boiler suppliers in this area quite a headache, after repeated comparison and investigation, we chose to partner with fast boiler. Fang did not disappoint quickly proved that the recommended boiler operation after use to fully meet our needs, both energy saving and environmental protection, high thermal efficiency, to a certain extent, cost savings for our fuel. --customer feedback

Electric heating steam boiler Products electric heating steam boiler is the electrical energy into heat of a new type of electric equipment, following the same "boiler Safety Supervision" and the manufacturing industry standard in design. By electric heating equipment, heating equipment consisting of furnace, safety accessories, strong, weak control systems and other components all have national compulsory safety certification mark. Full immersion heating elements fixed to the flange, easy to change freely. Circuit design using fuses, electrical harmonics are controlled to ensure effective protection of the safety of the power supply circuit. Boiler power control system using a host and a separated manner, to avoid disturbing the electrical and thermal aging electrical components. Product description features: ① may provide a direct product structure analysis, gas-assisted technology application support, precision molds (gas assisted mold), plastic products (gas assisted products), heat distortion temperature trace full service support molding technology; ② can be provided directly in the gas-assisted injection molding technique involves analysis of the product, mold design, optimization support mold, gas-assisted manufacturing mold, gas-assisted process support, a reasonable selection, and other gas-assisted equipment; many enterprises effective use of gas-assisted technology to enhance the quality of products, reduce production costs provide a strong technical support. ③ may be provided directly to all sets of gas-assisted injection molding system devices patents involved in the development of the company designed the special requirements for gas-assisted production, production and closely monitor, such as high reliability of compressed air purification system, maintenance-free three-year nitrogen separation system, the introduction of foreign produce high quality clean diaphragm high pressure compression system (compression pressure nitrogen completely solve the hidden oil contamination), and gas-assisted pressure control with high precision: the temperature change may provide direct heat trace technique involves molding All patents sets of equipment, including steam-assisted injection molding equipment, electric assisted molding apparatus, hot water and hot oil auxiliary molding equipment accessory, ④ may be provided directly GAIM equipment, heat molding temperature change trace all the technical equipment involved service, spare parts service, customers do not need to face before other vendors run the preparatory work: (1) the operator must know the location of the working principle of the boiler, all kinds of accessories, performance and working methods. (2), check the oil combustion, and each nozzle connection, power supply and the burner, the pump, the boiler installation accessory. (3), a clear main steam valve open, after closing the normal close it. (4), water level gauge inspection, confirmation flexible water level, normal position. (5), the pressure regulator is properly tuned, regulate combustion damper.

Gas-fired boilers are maintained twice a month on a regular basis. Inspection of fuel supply lines: 1. Light oil filter cleaning; 2. Air tightness inspection of ignition gas pipe road; 3. Check to see if the line is clear. b. Inspection of instruments: 1. Water level gauge flushing; 2. Pressure gauge bend flushing; safety valve test. c. Inspection burner: flame detector (electric eye) cleaning light surface; 2. Check whether the working pressure of oil pump is normal; 3. Check that the combustion flame is normal; 4. Check if the burner sound is abnormal when burning; 5. Clean cup disk; 6. Wash some water bars. d. Inspection of intake systems: 1. Cleaning water filtration 2. Whether the pump reaches the rated head and flow rate; 3. Check valve is working properly. e. Daily fuel tank drainage and cleaning debris. Water quality test, furnace water test. f. Check combustion consumption is normal. Maintenance projects every three months in addition to the above inspection items: A. Electrical parts: 1. Whether the line has loose aging, failure; 2. Checking the reliability and overload of electrical components; 3. B. When the soft water tank is not in use, open the low valve to remove the sludge. Testing boiler re-point interlock device: 1. Low water position; 2. Overpressure; 3. Turn off 4. Exhaust temperature Superelevation; etc. Smoke detection: including smoke composition analysis and tail smoke temperature detection, check whether the combustion is working or not. e. Clean boiler body and burner exterior. A. The main body part completely cleans the smoke pipe, water pipe, front and rear smoke box, furnace part and burn-up chamber and smoke pipe ash collection. 1. Fully open the cover to check the sealing integrity of the manhole, etc., and replace the defective gasket in time. 2. Complete inspection of integral instruments, valves, including pressure gauges, pressure controllers and electrode level controllers, and safety valve tuning. b. Burner section: comprehensive Clean burner rotor disc, ignition device, filter, oil pump, motor and impeller system, lube the valve connecting rod. Re-test combustion conditions. c. Control part maintenance and inspection of electrical components, control lines, clean control box ash collection, each control point for inspection. d. Repair water treatment equipment, check water quality, clean soft water tank, check operation and head of feed water pump, clean check valve core, etc.

1 electric steam boiler maintenance, maintenance when the boiler must be cut off and must relief. 2, the burner every two months to be removed from the boiler, carefully remove foreign bodies such as dust and soot. Photocell light-receiving surface wipe once a month, fuel filter should always be kept clean and filtering capabilities; carefully clean the filter in the pump, do not break the seal. Oil-burner not idle, so as not to damage the pump. 3, the water level gauge should always be kept clean, rinse the purge valve is opened, the water level in order to ensure a clear day. 4, pulling the safety valve once a day, to prevent rusting failure. 5, the boiler stops longer running time, cut off the power, and do maintenance work: (1), dry maintenance, shutdown after the release came out water, dirt clean the furnace, slow fire the pot with a burner after drying (burn time not too long, to avoid damage to the boiler), then drain all of the gas boiler, all pipe valve closed, checked every three months. (2), wet maintenance for a period not exceeding one month shutdown of the boiler, furnace shutdown after water release, discharge and clean fill with water, cut off the power, close the valve.

Related Information