As a famous elite fired steam boiler dombivali mumbai manufacturer in China, we have earned a commendable position among the top known boiler manufacturers owing to our finest quality industrial steam boilers such as gas fired steam boilers, oil fired steam boilers, biomass fired steam boilers, CFB steam boilers, coal fired steam boilers, etc. And we insist on promptly delivery which has drawn a mass of clients in our favor. ZG Boiler has extensive experience in designing and producing industrial horizontal steam boilers, and we sell and service through the largest and most experienced network of sales representatives in China. Our advanced representatives are capable of providing technical assistance, competent pricing, start-up and long-term servicing. Gas fired steam boiler made in China also has price advantage.

Steam boiler pressure gauge and hydraulic accumulator Henan fast boiler's elite fired steam boiler dombivali mumbai introduce small series with a pressure gauge and hydraulic accumulator steam boiler pressure gauge should pay attention to: 1, rated steam pressure of less than 2.45MPa steam boiler , not only the accuracy of the pressure gauge to 2.5; rated steam pressure 2.45MPa promoter or equal to a boiler, the pressure is too spread made not less than 1.5. Dial gauge diameter of not less than 100mm, in order to ensure the operation of the operator to see the surface of the pressure value shown. 2, should draw the red line on the dial gauge steam boiler, he pointed out that the maximum allowable working pressure. 3, the steam boiler pressure gauge should be provided at a convenient place to observe and purging, and to prevent the high temperature affected, freezing and vibration. 4, steam boiler pressure gauge should check at least every six months once the check should seal. 5, the pressure gauge connection tube steam boiler should leaks steam leakage phenomenon, otherwise it will reduce the pressure instruction value. 6, a steam boiler gauge scale element should be compatible with the measured working pressure, the working pressure is usually 1.5-3 times, preferably 2 times. When no steam boiler gauges, pressure gauges or pressure damage did not meet the requirements of the apparatus, boiler steam pressure gauges of the following circumstances, should stop using: 1, the surface glass breaking or blurred dial scale; 2, no seals , damage or seal verification period exceeded; 3, no pressure gauge pointer finite bit staple staple can not be restored to the limit at infinite set of bits from zero gauge pressure exceeds the pressure data bits garment allowable difference?; 4, the jump table or a pointer leak; 5, other effects gauge accurate defect. The use of the accumulator: the accumulator for a hydraulic accumulator system intermittent mechanical, hydraulic fluid may be stored in the actuator output when a batch or a low speed, and the actuator requires a large flow of fast-moving, as an auxiliary energy providing oil to the system together with the hydraulic pump, oil pump and thereby achieve miniaturization of the entire hydraulic system, to achieve the object of absorbing the impact energy sudden change fast opening and closing valve and the hydraulic load, the system generates a pressure shock, pet cause vibrations and noise, and even damage the machine. The accumulator can be alleviated, which absorb fluid shock absorber pressure pulsation absorbing accumulator, and reducing the pressure pulsation and flow pulsations of various pump, thereby reducing system noise and vibration. Having a damping effect of the gas spring accumulator, it can be used to absorb the mechanical vibrations between the body and the traveling wheel of the vehicle and the like. The accumulator can be balanced upright actuator (hydraulic cylinder) and gravity load decreases when the potential absorption into hydraulic energy store, while generating the rate-limiting resistance; upright when the actuator rises, releasing the original absorbing energy accumulator , together with the pump oil to the hydraulic cylinder, in order to achieve balance and energy.

Recently, the letters and the ecological environment unit, the letter of "boiler air pollutant emission standards" in the "gas boiler exhaust pipe predetermined height of not less than 8 meters, within 200 meters from the building around the radius of the new boiler room chimney when was the tallest building in which the chimney should be higher than 3 meters "requirement questions.

First, the new urban gas boiler chimney should be performed outside the specified height is 3 meters above the surrounding buildings (there are many communities within 200 meters around the building height higher)?

Second, on the 20t / h steam boiler and above, and more than 14MW hot water boiler to be installed pollution-line monitoring equipment, this means that a single 14MW boiler or boiler means the total audience of 14MW?

Third, for example, I have more than 2MW heating station natural gas hot water boiler 7 units, exhaust gas through the two exhaust pipe emissions, the need to install pollution monitoring equipment?

A "boiler air pollutant emission standards" (GB13271-2014) states that "fuel, gas boiler stack height of not less than 8 m, particularly boiler stack height is determined by the EIA document approved. Chimney around the new boiler room when there is a building within a radius of 200 meters, the tallest building in which the chimney should be higher than 3 meters. when there is a building within 200 meters around the new boiler house chimney radius, "according to the provisions in the new urban area gas boiler should be implemented", the chimney should be higher than the provisions of the tallest buildings in more than 3 meters, "the.

Two, 20t / h steam boiler and above, 14MW and more hot water boiler must be installed in the line monitoring apparatus contaminants "14MW and more hot water boiler" means a single boiler.

Third, on the "exhaust gas through the two exhaust pipe emissions, the need to install pollution monitoring equipment" problem, according to "People's Republic of China Air Pollution Prevention Law" Article 24 "key sewage units should be installed, using air pollutant emissions automatic monitoring equipment, and environmental protection departments to monitor network devices, monitoring equipment to ensure the normal operation of public and emissions information in accordance with law. "provisions, as well as the" State Council on the issuance of three-year action plan to win the blue sky to defend the notice "(Guo Fa [2018 ] No. 22) "outfall height of over 45 meters of elevated source, as well as petrochemicals, chemicals, packaging, printing, painting and other VOCs emissions from industrial sources focus, the focus of sewage into the Directory of key areas should be basically completed by the end of 2019 to install flue gas automatic monitoring facilities, the country should be basically completed by the end of 2020 the automatic installation of flue gas monitoring facilities. "requirements, if the exhaust pipe where the company was listed as key units of sewage, flue gas monitoring facilities should be installed automatically, otherwise, no installation.

Biomass boiler case:

The animal feed plant has a seasonal operation, but a relatively consistent load profile. The peak load is for 850 kg/hour of saturated steam at 8 barg (~650 kW see Figure 3). There is a much smaller load required for longer periods for miscellaneous process steam. The load is currently supplied by a very old light fuel oil (LFO) boiler. The load profile here facilitates an almost complete switch from LFO to biomass. 96% of the steam requirement would be covered by a 650kW biomass boiler. A small oil boiler, or built-in oil burner in the biomass steam boiler would be required to meet the smaller steam loads which would not be met efficiently by the biomass boiler. A straight-forward moving grate boiler with fire-tube heat exchangers can be used. The range of suppliers of biomass steam boiler equipment is limited below 1MW thermal as economies of scale are diminished below this level – a 650 kW boiler costs almost the same as a 1MW boiler.