boiler supplier

golden supplier central heat boiler

Fangkuai Company has a fully-automatic PLC intelligent control system designed and developed by itself with complete intellectual property rights. It adopts a combination of mechatronic control equipment and a programmable logic controller (PLC). Take the advanced programmable logic controller (PLC) as the "central processing unit" of the control system. The control system is operated through the touch screen, which greatly improves the degree of automatic control and operation reliability of the golden supplier central heat boiler, and the operation is simpler and more intuitive.

1149, what are the relevant personnel requirements and different golden supplier central heat boiler pressure and temperature Description: The boiler of this important site of learning products, the following will continue its work to learn, because this is all hope, this can be a better understanding and about this site products and increase their expertise. So, since good for us, then, what reason not to be taken seriously and conduct it, rather than wasted such a good learning opportunity. 1.10 tons of boiler, its consumption of natural gas per hour, how much is? In addition, different boiler, it is equipped with auxiliary, it is the same as you? 10 tons of boiler, which is on the calorific value, the equivalent of 6 million kcal. Therefore, if the natural gas heating value is calculated according to 8600 kcal, then, an amount of gas consumed per hour, is about 700 cubic meters. And on the issue of two, whose answer is NO, that is, different boiler, it is equipped with auxiliary, it is not the same.

What forms of chemical plant golden supplier central heat boiler inspection there? What forms of chemical plant boiler inspection there? Or organic heat boiler uses water as the medium pressure vessel was heated by a flame or electric heating, and multi-output heat to steam, hot water forms, during operation of boiler, the furnace member at a high temperature and pressure, or external temperature flame radiation, may occur wear, corrosion, distortion, scaling, and other defects over-burning, ash plugging may also occur, slagging phenomenon. More serious will lead to burst pipes or explosion and other accidents, if not timely detection to eliminate them, will eventually lead to loss of life, damage to equipment, to bring social unrest, cause losses to the state and enterprises. Check the boiler is a boiler to minimize the risk of the task. Boiler Inspection generally divided into boilers and boiler Supervision, Inspection and periodic inspection, the former is an integral part of the normal operation of the boiler in a test, divided into internal and external inspection test boiler boiler; the latter is mainly for boiler installation, alteration, major repairs an extremely important test carried out. 1, chemical plant boiler regularly inspect boilers periodic inspection refers to the periodic inspection of boiler inspection rules for safety and energy savings boilers carried out according to regular inspection prolong the service life of the boiler, including external inspection running under the boiler, boiler stop internal inspection and hydrostatic test under the operational state. External inspection cycle once a year; internal inspection period is every two years; the boiler because of structural reasons can not carry on in the inspection, hydrostatic test should be carried out, for the period of 3 years. Including internal content inspection for cracks, cracks, corrosion, scaling and other defects on the drum, boiler shell, superheater, airway pressure receiving member and the like; the same shall be the time when the problem occurs in the last test specimen methods for review. External inspection tests generally include the following elements: operation of the boiler external environment and load-bearing device, an external boiler piping, safety accessories and safety devices, auxiliary equipment. For external examination of organic heat carrier boiler, acidity should review inspection reports and records, kinematic viscosity, carbon residue, water and other indicators of compliance with national standards, to check its compliance with safety devices regularly boiler inspection rules. 2, Boiler Inspection Boiler Inspection supervision include chemical manufacturing supervision and inspection of boiler and boiler installation, alteration and major repair of supervision and inspection. Supervision and inspection methods commonly used data review, physical inspection and on-site supervision methods. When data review should be strictly regulated in accordance with the pot; when the inspection site monitoring, supervisory inspector should be carried out in accordance with the relevant system standards, to comply with the relevant safety specifications; when physical examination, in general, checks manner. Supervision and inspection of the boiler by the degree of impact on the safety performance of the boiler can be divided into A, B, C categories, followed by a significant impact, greater impact, the general impact. Former chemical plant boiler supervision and inspection, the following should be inspected units do a good job, ready to license within the validity period (but without permission or license application has been accepted); develop plans to submit construction plans or production supervisory agency; provided the necessary supervisory inspection work conditions.

Condensing gas golden supplier central heat boiler is a steam boiler on the basis of ordinary gas, the additional condensate recovery technology, fully optimized in terms of combustion, the furnace structure, the heated area and heat transfer equipment, so as to enhance the thermal efficiency of the boiler to a large extent , so that sets energy-saving, environmental protection in one.

Related Information