boiler supplier

horizontal multi tube fire tube boiler for sale

Waste heat recovery horizontal multi tube fire tube boiler for sale in cement plant supplier in china

ZG is a waste heat recovery boiler supplier with 70years history in china.ZG Group concentrating on supply high efficient and high intelligent boiler for customer.

Operation of a gas horizontal multi tube fire tube boiler for sale with the daily management of the boiler put into operation must meet the following conditions: 1, boiler passed the test. 2, the boiler has been registered on file, no use permits boiler must not be put into operation. 3, fireman trained personnel evaluation, obtain operating permits and operating the boiler to adapt. 4, it is necessary to measure the water treatment and water quality certified laboratory personnel. 5, a complete set of practical rules and regulations, including: 1) personal responsibility; 2) boiler operating procedures; 3) mobile inspection system 4) equipment maintenance system; 5) the shift system; 6) Water quality management systems; 7) clean system; 8) safety and security systems; (b) softened water boiler, water quality should be consistent with GB / T1576-2008 "industrial boiler water quality," the relevant requirements. (C) for preparing for the steam within the boiler steam pressure close to the operating pressure when, for the steam pot before the water level should not exceed the normal water level, combustion in the furnace before the steam supply should be stable. When the total steam supply steam valve slightly open, micro steam heating pipe, while the pipe line vent valve open, releasing the condensate, warm-time decided according to the pipe length, diameter, and temperature steam, generally less than 10 minutes. Note that the case of heating pipe should the pipe expansion and pipe stent, if there is no abnormal situation, stop heating pipes and eliminating faults and defects. Be heat-pipe, before full total steam valve, open when the condensed water should be carried out slowly pipeline is gradually reduced, while paying attention to whether the boiler has a special sound for each member, if any should be checked immediately. After total steam valve fully open, the total steam valve handwheel should be returned half, not prevent rotation of the thermal expansion. To prevent steam with water not allow in any case the water level exceeds a high-water mark on the glass.

4, staff to develop safety awareness

Regular boiler safety training to employees, promote employee safety awareness to develop.

Autumn and winter cold season is heating the peak of the northern city of Tianjin, with the heating period, fog, haze and other inclement weather has cropped up, as also the people a "blue sky" always in a good living environment, inside of Tianjin low-emission coal-fired horizontal multi tube fire tube boiler for sales reform process without delay. To improve the situation of air pollution, Tianjin start the "Blue Sky Project" plans to cooperate with the fast boiler, gas boiler will invest billions of dollars in coal-fired boilers within the city as a clean fuel such as natural gas as raw material.

Related Information