boiler supplier

hot water generator manufacturer

Blue Sky Battle horn started, our country constantly walking on the green road. Reduce atmospheric emissions of nitrogen oxides, improve air quality, but also the people a blue sky, the industry has invested in the construction of environmental protection go, Guizhou Baiyun Quan Lake Hotel is no exception. As we all know, fast hot water generator manufacturer R & D in the field of clean fuel boiler never stopped, through market research and screening, Guizhou Baiyun Quan Lake Hotel in October 2017 signed a low-nitrogen Thalia T5 series vacuum hot water and fast boiler boiler for hot water supply and heating the hotel.

However, the traditional brewing process cumbersome, inefficient, consumption cost, serious pollution. Particularly in the distillation process of taking the wine, a wine suitable steam generator is easy to use on the choice of wine, after all, the quality of the steam supply will directly affect the quality and degree of liquor.

Boiler Room universities loss to deal with the past most colleges and universities are using a large steam hot water generator manufacturer to produce steam for the canteen, water, bathing and heating, where steam is needed where to send, it is a waste. Now with fine design: Principles Steam steam equipment, water equipment with water, with hot water apparatus, and use the nearest, so as to save energy, reduce the cost, the effect manageable. Many schools have been rebuilt by this idea, achieved very significant results, the general transformation of the cost can be recovered within a year. Steam canteen: finned pipe steam: steam plant to meet all requirements; water: gas water heaters + finned steam pipe; water: air source or a solar-based, auxiliary heating gas hot water unit. Partly because of the loss of boiler: 1. Low efficiency of the boiler itself, and after prolonged use efficiency decreases, because: furring furnace, burner efficiency drops, Slagging ashes. 2. duct body loss, loss of pipe insulation, pipe insulation damage after loss increased. 3 does not match the amount of steam, Mara car; a pressure in excess terminal mismatch loss. 4, water in large boilers, heat loss, downtime restarted great heat need; 5, bulky water tank, heat dissipation area, and the insulation layer and the insulation layer thick enough damage; new boiler efficiency up to 90% but after using the terminal, the effective utilization rate of less than 40% utilization rate is even lower for some time, as long as the use of large-tonnage steam boiler on the above factors can not be avoided. Hot water bath, hot water within 40-60 degrees, a low quality heat, is a high quality hot steam, heating with high-quality low quality heat, certainly uneconomical. Hot water bath solutions include: solar energy, heat pumps (air source, ground source), gas water heaters and the like. How specific choice, depending on use environment, temperature, sunlight time, gas prices, electricity prices and other factors, to analyze specific issues. Cafeteria steam boiler is the key to solve the problem of stopping, previous methods to solve: 1 steam boiler generally cost at least 300 yuan / ton, the school used for steam dealers by way of subsidies. 2. The direct-fired equipment is generally used, the thermal efficiency is generally not more than 40% .3 use in a boiler or regulatory edge pressureless steam generator, the same thermal efficiency only 40%, the cost is greatly improved canteen business operators, operating simultaneously also very troublesome. There are other issues: bulky, large footprint, small stand-alone power, need several more, no vapor pressure, high water content, water is not treated with the use of prolonged increasingly inefficient, short life. Now Resolution: With the LEADER gas steam and gas water heaters, boiler room can easily solve the problem of losses, so that the school canteen dealers can be satisfied. LEADER gas steam characteristics: 1, no boiler room, without the need to handle the boiler permits, without kotelshchik: This product volume of less than 16 l system, outside the scope of the Boiler and Pressure Vessel requirements. 2, the use of the nearest: loss of small pipe. 3, high efficiency: oxygen-free copper fin heat exchanger thermal efficiency of 93% .4, modular combination: according to different needs of users for the amount of evaporation, the amount of hot water, tailored. 5, steam pressure up to 1.4kg, fully meet all the requirements of steam college canteen equipment. 6, high-power, small size: the largest single power of 300KW, the volume is only (L * W * H) 1050 * 400 * 1200MM.7, safe: with multiple security protection. 8, the processor is configured softener: water softener use of efficient processor, effectively preventing thermal efficiency reduction unit and pipeline clogging. 9, transformation action, low cost: the use of this product were boiler, gas flow, gas pipeline generally without transformation, the use of other equipment and without transformation.

You have to know the energy consumption of hot water generator manufacturer problems (blower power consumption rate, consumption steam) causes problems blower 1.1 boiler duct leakage. 1.2 Leakage air preheater. 1.3 excess air coefficient is too large. 1.4 coal into the furnace is deteriorated, coal from the design, the amount of coal under the same load to the generator, increasing combustion air volume. 1.5 the secondary air path resistance is increased. 1.6 low blower efficiency. 1.7 unit load is low or frequent starts and stops. 1.8 high inlet temperature. 2, the measures to solve the problem of operational measures 2.1 2.1.1 adjusted to optimize the combustion boiler according to the test results, control the excess air coefficient appropriate furnace. 2.1.2 ensure blower inlet, outlet baffle spacer in the fully open position. 2.2 routine maintenance and testing 2.2.1 blower characteristic test, to determine the optimum operating point and efficient workspace. 2.2.2 duct tightness check process. 2.2.3 damper flap defects in time. 2.2.4 timely check processing chassis, shaft seal leakage. 2.3 2.3.1 downtime in strict accordance with the provisions to adjust the fan movement gap. 2.3.2 vane opening adjustment of the blower motor. 2.3.3 check delivery port plate to open fan. 2.3.4 blower to clean the inside and imported silencer debris. 2.3.5 duct tightness check process. 2.4 transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.4.3 for energy saving fan efficiency below 75%. 2.4.4 Fan motor frequency energy transformation.

Related Information