boiler supplier

hotel natural gas hot water pipe boiler

To get industrial gas hotel hot water pipe boiler safe operation must be done to check the work of industrial gas-fired boiler pressure vessel belongs, in our country there are strict and clear standards of production and operation. In particular boiler in operation, should always pay attention to whether the safe operation of the boiler, auxiliary equipment and operation of each respective instrument valves is stable. Therefore, gas steam boiler room is necessary to establish a sound system of inspection tours and boiler room equipment maintenance system. First, natural gas boiler room mobile inspection system 1, in order to ensure the normal operation of the boiler and its accessory equipment, timely detection of problems, fireman on duty personnel at least once every half hour tour inspection. 2. Check gas boiler burners, pressure gauge, thermometer, circulation pump, water supply pump, water softening, safety accessories, an instrument, secondary instrument is functioning properly. 3, check whether the abnormal changes in various types of signal lights. 4, check the water level in the tank gas boiler, feed pumps, circulating pump and motor bearing temperature and pump lubricating parts are normal. 5, check the position of the gas valve and the steam boiler feedwater pressure switch valve is normal. 6, mobile inspection found problems in time, and test results recorded in the log boiler and accessory equipment inside. Second, gas-fired equipment maintenance system 1, two gas-fired boiler on the pressure gauge value is not the same timely maintenance, to ensure reflect the actual operation of the boiler pressure. 2, gas boiler pressure gauge damage, when the dial is not clear, timely replacement. 3, rotating machinery lubricating oil passage remains open, the oil cup to maintain a certain oil level. 4, run, run, drip, leak repair valves can be repaired, replaced. 5, inspection, maintenance and feed pumps, circulating pumps and pump valves open is flexible, single-stream if the door is closed tight. 6. Check the gas-fired secondary instrument is normal. 7, to remove dust on the equipment and the accessory device. 8, check the gas boiler safety valve manually turn on the water after closed trials are tight. Automatically turn on the water, blowing off steam at least once a week. 9, pressure gauges operate properly flushed at least once a week. Trap maintenance once a month. 10, over-temperature, overpressure alarms, overpressure interlock device checks at least once a month, and maintenance. Gas boiler pressure gauge, water level gauge and a safety valve are the three safety accessories on the gas steam boiler, with particular attention.

Various components of the electric steam hotel hot water pipe boiler is composed of different materials. 1, in order to prevent the occurrence of electrochemical corrosion, cathodic protection measures must be taken. 2, for the treatment of sewage, electric boiler blowdown bottom of the boiler flue gas condensation can be prevented. Since the flue gas is flue gas condensation (diesel or natural gas) and the flue gas temperature in the aqueous too low, water generated. A portion of the moisture is discharged from the chimney, the chimney wall is absorbed, the rest is deposited on the bottom of the chimney.

Harbin Thermal Power Co., the main city of Harbin is the largest cogeneration business, the company bear the city's heating area of ​​24 million square meters, to provide heat supply for more than 400 agencies, enterprises and 140,000 residents. Currently, the company is actively respond to the latest environmental standards introduced in China, the group mobilized up and down, stepping up technological innovation, upgrading environmental protection facilities, the project is expected to complete upgrading coal-fired hotel hot water pipe boiler at the end of this year.

Harbin Thermal Power Co., the existing five boilers for heating and power generation: where to cogeneration units No. 7,8,9, and the other two hot water boilers. No. 9350 MW units which since 2017 was completed and put into operation, has achieved ultra-low emissions standards during construction. 7, No. 8 is 300 MW units were built in 2005 and 2006, these two units of environmental transformation began in 2013. Harbin Thermal Power Co., according to the latest environmental requirements, environmental upgrading facilities. First, soot emissions transformation, the introduction of advanced electric bag filter, followed by addition of sulfur, in addition to the transformation of nitrate, new burners in addition to the low nitrogen oxides of nitrogen, a wet desulfurization technologies in addition to sulfur dioxide. After four consecutive years of continuous transformation, 7,8 units in 2017, all the transformation is completed, achieve ultra-low emissions standards. For the two 116 MW hot water boiler was built in 2013, it has long been included in the transformation plan. Earlier this year preparatory work has been completed and environmental transformation has entered the bidding process in mid-October to start construction, completed renovation project at the end of December.

Gas hotel hot water pipe boiler Burner Failures and gas boiler burners Failures and - best  a gas boiler, gas boiler burner ignition misfire rod reasons: 1, the ignition bar gap interposed carbon residue with oil. 2, ignition rods fragmentation. moist. Leakage. 3, the distance between the ignition does not stick, too long or short. 4, ignition rods Insulation damage, short to ground. 5, ignition cable and transformer failure: cable, connector damage caused by a short circuit during ignition; transformer break or other fault occurs. Measures following five: Clear, renewal, adjust the distance, change and switching transformer. Second, gas boiler, but spark ignition rods misfire reasons: 1, the cyclone disc space ventilation is blocked carbon, poor ventilation. 2, dirty oil nozzle clogging or wear. 3, the throttle angle is set too small. 4, the firing bar from the leading edge from the oil nozzle tip inappropriate (too protruding or retracted) 5, the first solenoid valve is an oil debris blocking gun (gun small kerosene). 6, oily or too viscous to flow easily clogged or the oil filtration system the valve is not opened, so that insufficient suction pump, oil pressure. 7, the filter pump itself blocked. 8, the oil more water (boiling abnormal noise within the heater). Measures are: Clear; first wash, such as not renewed; turndown test; adjusting the distance (in 3 ~ 4mm as well); Remove cleaning (cleaning the parts diesel); Check tubing and oil filters, insulation equipment ; remove peripheral screw pump, carefully remove the cover inside out oil network, with immersion oil; renewal of the test oil.

Related Information