boiler supplier

how connect mobry on steam boilers

Since I began preparations for the 2018 ASME certification program, and at the beginning of the project preparation work since January this year, the project has entered a crucial stage of the implementation. Ms. Jiang Lianju quality system under warranty division led to ASME certification were careful overall planning work to develop a detailed plan of the evidence, and careful organization departments to participate in the work of the various stages of implementation.

The main role of institutions and boiler fans: the many types of boiler fans, generally, centrifugal, axial, and Roots blower. Boiler cited general, blowers are centrifugal fans. Cited boiler blower is the same structure, but different functions and installation location.

How boilers and furnaces and bath boiler tubes What are the requirements? Boiler and furnace, which is what you need to know? About boiler, which related to difficult problems, not in front, but the urgent need to know and understand? Ask these questions, its main purpose is to be completely resolved, thus, help you to successfully use the boiler, and then, get good use of effects and economic benefits. 1. boiler and furnace, what should it be? Boiler and furnace for a specific process is as follows: first steam valve and opens slowly, not too fast to avoid problems such as instability vapor pressure, then, two boilers are coordinated and slow overload. If in the process, risk factors found to affect the safe operation of the boiler, then it should stop immediately and steam until after the elimination of these negative factors, then steam and work. Also, pay attention to adjust the water level in the steam load is moderate, not any problems. 2.G1, G2, etc., specifically refer to? Central boiler furnace temperature is generally controlled to what extent? G1, which refers to a stoker boilers, G2, refers to two stoker boilers. And so on, G3 refers to three boiler fireman. The reference standard for TSGG6001-2009 "boiler safety management and operational personnel examination outline." As for the center temperature of the boiler furnace, under normal circumstances, it is controlled in this range 900 ℃ -1100 ℃. 3. bathing in the boiler tubes, what requirements? In addition, the auxiliary boiler, which is the general concept of it? Boiler tubes in the bath, is not predetermined portion of its media activities, media emptying can then be emptied as far as possible, can not be emptied, it should regularly discharge or take microfluidic way to avoid frozen pipes this problem occurs. The auxiliary boiler, which is a general concept, therefore, on the issue of two, whose answer is yes. Further, in the upper part and which apparatus comprises means, there are many, here, not one is illustrated.

You have to know the energy consumption of boiler problems (heat loss) 1, Boiler heat loss problems arising 1.1 insulation materials selection does not meet the technical requirements. 1.2 insulation material physical and chemical properties do not meet the technical requirements. 1.3 insulation construction technology and service do not meet the technical requirements. 1.4 insulation material expansion joints mishandled. 1.5 temporary repair is not timely recovery equipment insulation or insulation effect is not good after the removal of insulation. 2, measures to solve the problem at least once insulation testing, testing the insulation quality of 2.1 per year. 2.2 the surface temperature of the heat transfer member should be exceeded insulation, insulation work, paying particular attention to the valve flanges, elbows, etc., it is detached and loose insulation should be repaired. 2.3 pairs of top sealing structure, the furnace lining, the furnace wall portion of the combustor where insulation checking process. 2.4 pairs of roof and wall furnace boiler tightness poor, should adopt new materials, new processes or measures to reform the original structure to be addressed. 2.5 The use of the site and the desired physical and chemical properties of the material, the selection of qualified insulation material. 2.6 The case of rigor boiler wall and the sealing cap, the heat pipe device and the surface temperature or heat loss, and the excessive insulating structure, determining maintenance items. 2.7 strengthen thermal equipment, piping, valves, insulation monitoring and maintenance, the insulation effect should be included in A / B repair project completion and acceptance, insulation in good condition should be included in the C / D repair, eliminating defects and routine maintenance shutdown lack of consumer acceptance of the project.

Related Information