boiler supplier

how to clearing boilers

What preparation needs to be done before installing the condensing how to clearing boilers?

With the improvement of material living standards, modern people generally have higher requirements for the temperature state of their environment. Since the advent of research and development, condensing boilers have successfully attracted the attention of a large number of social groups. After an in-depth understanding of the performance of condensing boilers, many social groups are scrambling to buy. At the same time, the installation of a full range of condensing boilers has become an urgent problem for many buyers, so what preparatory work should be done before installing the condensing boilers?

1, it is well known that environmental protection has become an issue of great concern in today's society, and the relevant departments have formulated a series of rules for the installation and use of boilers. Those enterprises and institutions that do not meet the requirements will not be able to install the condensing boilers smoothly even if they have purchased them, so be sure to verify that they are qualified for installation before installing the condensing boilers.

2. The second item is to check whether the parts are complete or not the existing condensing boilers in the market usually need to go through many links from the factory to the formal operation in which the transportation and storage are the necessary links for the boiler to be put into the market. If the relevant work is not done in these links, the performance of the condensing boiler may be affected. Therefore, it is necessary to check the appearance of the boiler and the completeness of the fittings before installing the condensing boiler.

3, the installation of auxiliary mobile equipment will be ready because most condensing boilers are relatively large and difficult to move, if the installation depends solely on manual handling or movement is not very realistic. Only by means of large-scale hook-hanger equipment can the condensing boiler be placed in the intended installation position, so the enterprise that buys the condensing boiler will need to prepare the auxiliary moving equipment before installing it.

To proceed from reality, should be in accordance with the electric power, gas should the gas, the coal should be coal, should be hot the thermal principle, promote the use of all kinds of clean energy for winter heating cleaning. In order to reduce air pollution and protect people's warm winter as a foothold to enterprises, government promotion, residents can withstand the principle of gas after the first change to gas will change in gas assurance, the price is acceptable on the basis of sound promote the "coal to gas" and central heating engineering, in district heating supply pipe network can not cover, vigorously implement the replacement of coal-fired power heating project.

Good job of marketing system storage capacity for natural gas. Accelerate the construction of natural gas transmission and distribution network, the new natural gas volume priority for life and severe winter areas of urban air pollution and coal for heating alternative. In principle, to new natural gas cogeneration and gas chemical projects.

Accelerate agricultural and pastoral areas "coal to electricity," the process of upgrading the power grid. Coordinate development of power transmission project construction, etc. are encouraged to promote the regenerative electric heating. Around on the "coal to electricity" project supporting grid should be given support, coordination "of coal to electricity," "coal to gas" land for construction.

In accordance with national requirements, shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.

According to air quality improvement requirements to accelerate the delineation of high-pollution fuel combustion zone ban and to expand the scope of, and actively promote the elimination of small coal-fired boilers. The county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers and tea furnace, stove and other operating coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, other areas on no new 10 tons of steam per hour of coal-fired boilers. While banned out of coal-fired boilers, pressure boilers market regulators cancellation of registration certificate to use.

It is learned that, with central heating Hohhot foreign loan program continued with the completed and put into use, the city built-up area will further strengthen the centralized heating rate, gas hot water how to clearing boilers to replace the coal-fired hot water boilers layer by layer, to become the first to Hohhot the region of central heating gas standard shape of the city.

Buy condensing how to clearing boilers business units attention, and Considerations on these should not ignore the use of high thermal efficiency, long service life, stable output ...... These unique advantages make condensing boilers in many industries and areas have a high reputation. Of course, we all know condensing boiler is very easy to use; but also to understand, easy to use is based on the correct operation of condensing boilers, fast Boiler come to you a brief three-point precautions for use. First, the operation before use prior to the installation condensing boiler, the boiler must be strictly in accordance with instructions provided by the manufacturer of the water, using the specified additives to clean the piping system, and with a neutral acid-alkali detergent. If the acidic water or alkaline water used in the cleaning process, likely to cause corrosion of the boiler. Therefore, in accordance with a predetermined, boiler feed water to PH value is within a predetermined range of values. Second, the operation of condensing boilers must be installed filters, or is likely to cause damage to the boiler. Before boiler operation, be sure to water treatment, removal of impurities inside. Condensing boiler outage, safe discharge valve must be opened to remove impurities, regardless of whether oxygen, must use tiny impurities separator. And the system return pipe condensing boiler must be installed filters to prevent impurities or sludge occlusion system, damage to the boiler. Third, should the boiler is running late after running inspection and maintenance must be in strict accordance with the instructions to use, there are problems resolved immediately to avoid further damage to the system, resulting in more severely affected. Maintenance, if the new system, it should be thoroughly washed to remove the flux, grease and metal chips generated during installation residue; if the old system is should be noted that should ensure flushing removed metal oxides and other corrosive residue was again each low point, ensure that the system completely emptied. Note that the above-mentioned three key elements condensing boilers operate fast boiler presents for everyone, and if want to make full use of condensing boilers, these elements are necessary to understand and to memorize carefully executed. We will conduct a detailed user guide teaching when using condensing boilers in domestic professional consumers to buy before and after will be described in detail, but also in the product to consumers.

Related Information