boiler supplier

how to increase water pressure in boiler

The composition of the rice husk and the reactions that can take place in the combustion chamber and on how to increase water pressure in boiler tubes are major contributory factors to the level of sintering, slagging, fouling and corrosion. It is thus very important that ash elemental analysis; a good knowledge Of ash composition, and the impact these have on the boiler at high temperatures and pressures are taken into account in the initial boiler design.

That is, the number of hotel rooms and heating area of ​​the first consideration, the number of rooms determines the water, how to increase water pressure in boiler size selection every day, mainly from the two parts. Heating part of the general design per square 80-100W, such as the hotel area of ​​1,000 square feet, it is the power required for heating the gas boiler portion 80KW-100KW; the water portion of the number of rooms, is calculated using a peak at the hotel while hot, hot water boiler heating generated as long as the use of the hotel to meet the peak hot water. 100 such as hotel rooms, in general, while the hotel bathing water is 30% of the total amount, i.e. 30 rooms simultaneously hot water, calculated per 100L, the maximum peak 3 tons, the boiler power is calculated for 3 tons per hour how much heat the water needs to be, because a similar hotel, bath center of these large water commercial establishments, the general design of the proposed installation will open about 10 tons of stainless steel water tank, low-power boiler slowly heated hot water tank, saving early investment in equipment cost, and can ensure all-day hot water usage, best of both worlds.

The methods of cleaning and removing scale can be divided into mechanical descaling and chemical cleaning, among which chemical cleaning can be divided into alkali cooking and acid cleaning. The methods and requirements of how to increase water pressure in boiler descaling are briefly described as follows:

Fast how to increase water pressure in boiler particularly strong technical team, they listened carefully to our needs and give us tailored technology solutions, from boiler production, transport to the site installation and commissioning took only 35 days time, all aspects of the deal in place, the boiler quickly it is put into use. --customer feedback

Related Information