Note matters including gas boiler gas water boiler, gas hot water boiler, gas industrial 1 ton vertical steam boiler operation gas boiler, gas hot water boiler which is also known as gas heating boilers and gas boilers bath, as the name suggests refers to the gas boiler fuel gas boilers, gas boilers and oil-fired boiler, electric boiler compared to the most economical, most people have opted for a gas boiler as steam, heating, boiler equipment for bathing. Note that the operation of the gas boiler gas boiler valve matter is very common to use an apparatus of the plant, under normal circumstances the handle, thorium clockwise rotation of the handwheel is turned off a predetermined direction, the rotation is defined as counterclockwise opening direction. But before the operation should focus on some check valve opening and closing flag after the operation. The following gas boiler manufacturers of small series simply to introduce the next gas boiler ajar fast opening valve operation Note: gas boiler slowly open the valve to open, slightly open after the quick opening valve, preheat the pipe and then fully open. For better results the sewage, can switch several quick open valve. After discharge, turn off the quick opening valve, then slowly open the valve is closed, and finally open about fast opening valve between two valves to put water in the net.

Corner tube industrial 1 ton vertical steam boiler is one type of chain grate steam boiler. ZG manufactured corner tube biomass fired steam boiler’s power is among 6 to 15 MW. This biomass fired steam boiler adopts corner tube pattern, self-supporting structure. The furnace and the descending fuel gas duct adopts total welding membrane water cool tubes wall structure, which has benefits of good sealing, lower heat reducing. Both air pre-heater and economizer adopt case pattern structure which is convenient to transport and install. As a top steam boiler manufacturer in China, our single drum corner tube biomass fired steam boiler made in China is both eco-friendly and high efficiency.

Boiler Association party leaders to come soon Group: innovation and development has won high praise, Secretary General of China Association for boiler water treatment boiler and arrogance Ling Wang, Assistant Secretary Guo Hua, chief engineer Tongyou Wu and his party three people come fast Boiler Group inspections visits, Luhai Gang president accompanied by full enthusiasm.

The preparation you need to do before the boiler is installed

The boiler is a device that supplies steam and hot water for industrial production or daily life. After the company purchases the boiler model, it needs to consider the installation problem. The installation of the boiler is directly related to the important steps of the smooth operation of the boiler, except for the installation of the auxiliary machine. Also need to pay attention to the preparation before installation.

1. Handling the registration of natural gas boiler installation: According to the “Safety Supervision Regulations for Steam Boilers”, the units that use the boilers should go through the registration procedures one by one. The boiler use unit shall have a person responsible for the boiler installation work, responsible for contacting the local boiler supervision agency and filling out the installation notice. When the boiler is installed, it must be attended by a furnace, and it is equipped with a pipeman, a fitter, a hoist, a cold workman, an electric welder and an auxiliary worker.

2. Determine the installation location and qualification of the boiler to determine the installation location. The boiler installation unit must have a boiler installation qualification certificate issued by the superior authority in accordance with the installation scope.

3. Inspection of boilers and accessories: Before the installation of natural gas boilers, the boiler body, combustion equipment, components, natural gas boiler auxiliary machines and accessories shall be inspected and accepted according to the drawings, and records shall be made. If it is found that the relevant standards are not met, it shall be promptly submitted to the factory. .