boiler supplier

industry gas steam generator high quality

Throat automatic electric supply system of the industry steam generator high quality, steam drying steady flow supplied to the user. When the water into the tank, the power switch, controlled by the drive signal, high temperature solenoid valve is opened, the pump work, is injected through the check valve furnace. When the solenoid valve, the check valve is clogged or damaged, the water pressure reaches a certain overpressure valve through overflow back into the tank, to protect the pump. When the tank without water or residual air in the pump piping, air not only into the water, as long as the rapid exhaust through the exhaust valve until the discharge water, close the exhaust valve, the pump will function. The main water supply system component is the pump, they use a multi-stage vortex pump of higher pressure and a larger flow rate, using a small part of the diaphragm pump or a vane pump. Stainless steel mechanical float level controller for generator furnace large volume, the working pressure is not stable, but easy to washable, maintenance and repair. Furnace boiler body generally use special seamless steel pipe, elongated upright. Most electric heating system or a heating tube used in a root canal curvature combination of stainless steel heating, while the surface load is generally about 20 W / cm. Due to the higher pressure and temperature when the generator is working properly, the safety protection system in the long run can make it safe, reliable and efficient. It is generally produced using high strength copper alloy valve, check valve, an exhaust valve, implement three protection. Some products also increased the water level in the glass tube protection device, increasing the user's sense of security. Product choice points: Electric steam boiler main control parameter is selected nominal evaporation, thermal efficiency of the boiler design, the rated steam pressure, the rated input electric power and the like. Use of electric steam boilers should meet the requirements of national and local restrictions related standards, norms. Using the selection of appropriate thermal storage electric boiler system, i.e., when the low electric power, the heat stored in the heat storage medium; at peak power stage, the heat stored in the heat storage medium released for users. It features electric boiler thermal storage system is different for peak electricity prices, operating cost savings for the user, and by peak load shifting power grid, good for grid security, economic operation. Electric steam boiler with the steam accumulator reservoir may be higher, the higher the heat of the argument, but the high electric steam boiler plus steam accumulator system cost, operation and management require a higher level, and therefore, do not ask for the heating parameters heating, living, air conditioning system, electric steam boiler plus steam accumulator system is rarely used. Electric power distribution chamber should be supplied directly to the boiler, the discharge conveyor can be used, or a metal cable. Determining the load and the number of electric boiler, boiler room should be combined transformer capacity equipped with comprehensive consideration. Many boilers can share a transformer, but not multiple transformers to supply a common boiler. Taipower power single steam boiler should not be greater than 2.4MW. Steam boiler feed water pot outside the general chemical water treatment, water quality should be specified. Installation and construction, installation points, boilers and auxiliary equipment, water treatment equipment should meet the technical requirements of the device manufacturer. Equipment foundation must be the arrival of equipment and after verification and design drawings before construction. The highest point of the pipeline deflation, the lowest point turn on the water. Acceptance pressure test after the pipe installation. Electric boiler room should all be grounded electrical equipment and heat storing devices. Precautions: power supply voltage can not exceed ± 5% of the rated voltage. Choice of fuel kerosene, diesel oil, do not use gasoline and heavy oil; when winter temperatures below 0 degrees, 0 # diesel oil are often solidification phenomena, not to use, it is best to use -10 # diesel or kerosene. You must be ground wire construction requirements:! Strength of electrical wiring must be separated, such as walking level sensors, pressure sensors and other electrical control of strong and weak lines output lines of the controller separately. When the installation site, should not wear in the same PVC pipe as arranged in parallel should be held at least 200mm intervals. Ban placed around the boiler gasoline, bananas, water and other inflammable and explosive materials. When using a gas boiler-room electronic leak detection alarm device should be installed to prevent accidents.

In particular reactor is often used to complete the production process of curing material, hydrogenation, alkylation, polymerization and condensation process. Reactor for heating, cooling and gas absorption and liquid extraction processes require a physical change to using the apparatus to obtain a good stirring effect. Chemical plant reactor inseparable, many chemical plants in order to save costs, the reaction vessel of the production system to the original electric heating industry steam generator high quality heating steam, nearly million annual cost savings, cost reduction for the company by Adds new efficiency initiatives.

Which areas of the structural characteristics of Henan steam boiler used mainly for: Henan steam boiler boiler very short time and efficiently reach operating temperature and pressure of the set, even in the replenishment process, there will be no temperature and pressure in the fluctuation. Automatic electric heating industry steam generator high quality with automatic integrated operating system, automatic water, automatic replenishment, the top electrical steam generator arranged vertically mounted, can effect the thermal expansion and contraction scale is deposited on the electrical heating element under rapid peeling off. Mainly used in the food processing industry, packaging machinery industry, bio-chemical industries. 1, the water supply system throat automatic electric steam generator, steam drying steady flow supplied to the user. When the water into the tank, the power switch, controlled by the drive signal, high temperature solenoid valve is opened, the pump work, is injected through the check valve furnace. When the solenoid valve, the check valve is clogged or damaged, the water pressure reaches a certain overpressure valve through overflow back into the tank, to protect the pump. When the tank without water or residual air in the pump piping, air not only into the water, as long as the rapid exhaust through the exhaust valve until the discharge water, close the exhaust valve, the pump will function. The main water supply system component is the pump, they use a multi-stage vortex pump of higher pressure and a larger flow rate, using a small part of the diaphragm pump or a vane pump. 2, the central nervous system level controller is electrically controlled steam generator system, the electronic and mechanical divided into two categories. Electronic probe electrode level controllers by three different high and low control level (i.e., the difference in height level) so as to control the heating time of the water supply pump and the furnace heating system, working pressure is stable, broad range of applications . Stainless steel mechanical float level controller for generator furnace large volume, the working pressure is not stable, but easy to washable, maintenance and repair.

New Year period, Tongchuan City, Shaanxi Province seized by special pressure class inspectors seize the time, nonstop, through the tireless efforts have seven working days, the time limit runs successfully completed the Tongchuan city water quality testing and inspection work hundred sets of heating boilers.

In recent years, with the state-owned enterprises "three for one industry," the pace of the transfer of a separate depth step by step, in 2019, Tongchuan City Gas Co., Ltd. and Tongchuan Mining Co., Ltd. together for the original Tongchuan Coal mining companies and construction companies and their subsidiaries heating boiler units of unified management, are responsible for heating in winter work Yintai District and Wang Yi district within the city limits and nearly 30 residential units.

After receiving the application of these reported that construction of heating boilers, special prosecutor of the city leadership attaches great importance to immediately convene all pressure classes held inspectors "to ensure safety, promote harmony" will mobilize, deploy test the backbone of the boiler units get together and reported in accordance with inspection, quantity, wide distribution and other characteristics, develop a reasonable and effective inspection plan, centralized arrangements for the inspection of boiler units, inspectors have extensive under the jurisdiction of the Meiyuan district, dragon community, nearly 30 residential and hospital infrastructure companies run first-line heating boilers, boiler to run one by one test, carried out investigation and security risks, all currently in operation has successfully completed a water quality testing and inspection of boilers, boiler inspection a total of 101 units, 90 water samples boiler. In the access to information process safety management of the outstanding problems that exist in the use of boiler units, in accordance with the relevant regulations and safety requirements of technical specifications, targeted proposed guidance. During the inspection the boiler, for general questions, on-site supervision and the use of units of the rectification. Meanwhile, the inspection found two Royal River Area of ​​boiler pressure parts leak is still sick to run for the safety problems on the spot requires the use of units to stop using the site issued a "special equipment inspection and opinions notice" to use the unit under and timely reported to the Council and served on equipment safety supervision departments seat safety supervision departments to actively supervise the use of the unit for rectification, at present, the use of hidden problems rectification units have been completed, the re-examination confirmed that security risks have been eliminated, effectively guarantee the safe and stable operation of the boiler .

Related Information