boiler supplier

jual steam generator lokal

Recently, Jinan City issued a "supplementary notice on accelerating the city's boiler-depth treatment of work-related" and formulated the following objectives.

I, on the in-depth treatment of boiler completion time. Low Nitrogen transformation and the transformation of the city's ultra-low emission gas-fired boiler biomass boiler to complete the appropriate time to relax, and strive to be completed in the end of June 2019, due to the commitment of heating (cooling) or involving people's livelihood and other support complex transformation process of the boiler furnace, indeed practical difficulties, completion time may be extended to the end of October 2019.

Second, on the in-depth treatment boiler standards. According to the "program tackling autumn and winter", the low nitrogen gas boiler after transformation, in principle, is not higher than the concentration of nitrogen oxides emissions of 50mg / m³, according to encourage the transformation of 30mg / m³. Encourage the transformation of biomass boiler with ultra low emissions coal-fired power plants.

Third, on the time-depth treatment of boiler arrangement. 2018 10 completed before the end inventory information verification, planning work; organize the implementation of the completion of the work before the end of May 2019; the end of June 2019 to complete the inspection work (due to heating and other disabled do not have to bear the acceptance conditions, available at the end of November 2019 before the completion of acceptance).

Fourth, on the information submitted to the work. Please ring the economy Zi [2018] No. 175 document complements the "Jinan City gas boiler investigation Summary Sheet" on or before October 12, "Jinan biomass boiler investigation Summary Table" to the Municipal Environmental Protection Bureau. On or before October 26, the "Jinan City Boiler depth management plan summary table", "Jinan hole sampling and sampling platform standardization construction unit summary table" and has completed the in-depth treatment of the boiler reconstruction proved supervisory monitoring report submitted to the Municipal Environmental Protection Bureau . Since the beginning of November, every Friday morning before 10:00 (for the first time submitted November 2) the progress of reform in-depth treatment of each unit case to the Municipal Environmental Protection Bureau.

Steam boiler proper installation procedures, miss it, you will fall into the boiler installation is a lot of traps installed when you buy the real steam boiler suit your business, faced a primary. How to install the boiler correctly, ensure the normal operation of the boiler too late? Do not worry, we only produced high-quality fast boiler boiler, also has high Di service. On how to install the boiler correctly, we will send a professional and technical personnel to guide you. First, we must examine the installation environment of the boiler, boiler room layout should obtain prior consent of the local quality and technical supervision departments before construction, should be installed in the boiler room ventilation, cooling, flue gas emissions and easy place to facilitate the operation, not easy to close burning explosive materials, electrical installation should be invited by the relevant professional and technical staff to install the national scale, N and L lines must not be wrong. When using a gas as fuel should proof electrical installation means away from the switchboard should 6M boiler above. Secondly, if your boiler is electric steam boilers, the installation should pay attention to the ground as it relates to the use of safety later. In order to secure the ground wire installation, a ground line nearby and piling a depth greater than or equal to 1 m 5, the cable connector ground should be sintered at a ground pile head. Moisture to prevent rust should be higher than the ground connecting linker 100mm is appropriate. Boiler exhaust chimney to be discharged toward the outside should be, and should be higher than at the outlet of the boiler Di from 1.5 to 2 m. Ask your local branch overhaul of special equipment installed after the declaration. Acceptance by the relevant part of the consent to the use, and receive a use permit before using the boiler. 30L or less than the vapor pressure of the jual steam generator lokal volume is less than 0.1MPa fall within the scope of the national exemption, ie no need for boiler use permits can be used. According to fast boiler for you to order a steam boiler installation steps, I believe you'll succeed in steam boilers will be installed successfully!

Is selected from the steam boiler heating gas boiler hot water boiler according to the output medium to distinguish, it can be divided into hot water boiler, a steam boiler. In daily life, many industries will be used in heating boilers, conventional heating, steam boilers and gas heating boilers can meet the basic requirements, but now using a hot water boiler. ? So in the end the election heating steam boiler or hot water boiler with a steam heating boilers, heat exchangers use more intermediaries do, in fact, reach the user's media is still hot, steam heating but has several disadvantages: 1, heating up too fast, heat is cold and hot temperatures, easy to leak. 2, the booster fast, easy to cause a heat sink metal fatigue life reduction, are likely to cause the radiator burst. 3, the water in the boiler heating fuel absorbs heat released, and the water molecules have to absorb some heat into steam, causing energy waste. Therefore, the use of heating hot water boilers for more energy-efficient than steam boiler, so one after another in recent years, some local steam boiler heating system to heat hot water boiler, steam boiler when the heat source is less and less, even extinct. But there are many like hospitals, hotels and other places need both steam and hot water needs, then choose steam boiler or hot water boiler is necessary to have specific analysis: If the hot water heating system using a large amount of steam required is very small, it is recommended another arranged outside the small hot water boiler steam boiler or jual steam generator lokal in order to meet the needs of a small amount of steam. Because based on actual experience, in addition to a steam boiler efficiency problem in itself a significant attenuation in the low load operation outside the state, the greater the loss of energy consumption, energy efficiency is generally only about 60%, serious waste of energy. Overall, commercial premises heating systems, gas hot water boiler to be more significant than the energy-saving advantages of steam boilers.

7) Steam from the steam drum is sent to the primary superheater.

8) Steam is super heated to a high temperature and pressure in the primary superheaters and then moves to the secondary superheaters.

9) In the secondary superheaters steam meets the very hot gases exiting the top of the boiler. The steam is heated to its final temperature and pressure before leaving the boiler as main steam. The main steam is sent to the high pressure steam turbine. The steam turbines drive a generator which produces electricity.

10)Steam exiting the high pressure steam turbine is called cold reheat. It is reheated in the reheater and sent back to the second steam turbine.