boiler supplier

new salable steam boiler

The necessity of water pressure test before the operation of the gas-fired hot water boiler/ gas new salable steam boiler

After the components of the gas hot water boiler or the gas steam boiler are installed as finished products, after long distance transportation, loading and unloading, and installation, it is inevitable that collision and damage will occur. Therefore, it is necessary to conduct a water pressure test after installation. Practice has proved that the boiler pressure can be found in the water pressure test and the corresponding measures can be taken in time to ensure the safe operation of the boiler.

Tai Chi, Jiaozuo City, Jiaozuo City Sports Center is one of important sports infrastructure, a total area of ​​11.73 hectares, held several international events. With strict management in Henan Province for air emissions of pollutants, Jiaozuo City, also launched the governance of coal-fired boilers, thermal power and other equipment. Jiaozuo Sports Center actively cooperate with municipal workers, took the lead from coal to gas activities, the serious pollution of the original extent of coal-fired boilers to replace gas boilers. Gas boiler cleaning binding understanding of the market, to achieve cooperation with the finalization fast boiler by providing a fast side 2.8MW integrally condensing gas hot water boiler (WNS2.8-1.0 / 95/70-YQ), it is used to Sports Center provides heating and hot water.

Fangkuai boiler quality management procedures inspection: (1) strictly follow the three (according to standards, according to drawings, according to technology and technical documents) inspection, inspection according to three inspection (self-check, mutual inspection, special inspection), to ensure that the three non-(non-conforming materials are not put into production, If the unqualified workpieces are not transferred to the next procedure, and the unqualified products are not put into the storage). (2) the next working procedure shall not be transferred to the next procedure for the non-qualified products, and the next working procedure shall not be carried over to the next procedure. The next procedure shall have the right to refuse acceptance. (3) the process inspection shall be subject to the first inspection, the circuit inspection and the completion inspection. (4) sampling and full inspection: 1 the key process must pass the production worker self-examination. After passing the test, the inspection personnel shall be handed over to the inspectors for full inspection, and the detailed inspection records shall be made. 2 the production operators in the main processes shall submit themselves to the inspection personnel for special examination after they have passed the examination, and the inspection personnel shall carry out random inspection or full inspection according to the requirements of the technical documents, 3 the production operator of the general procedure shall pass the test and submit it to the inspection personnel for inspection, and the inspectors may carry out the sampling inspection according to the requirements of the technical documents. 4 materials, welding, and welding shall be carried out according to the requirements of the technical documents. Non-destructive testing and other procedures must comply with the relevant provisions of this Manual and the requirements of the quality Management system. 5 parts or semi-finished products transferred to other workshops, the inspector signed on the job transfer form. (6) according to the eight key stop points H of the control point list of the container manufacturing quality plan, each responsible engineer must come to the inspection and carry out the control work on the spot.

Design pressure in the boiler, based on the geometry of the pressure member and the strength of the metal material used and the mechanical characteristics and other conditions, is calculated according to the relevant national standards promulgated by the strength of the individual pressure elements are calculated respectively, and then selects one from It can withstand the pressure of the lowest value, as this boiler maximum allowable working pressure. Boiler design working pressure but also said that "Rated outlet steam pressure."

6, steam temperature: indicates the degree of cold objects referred to as "temperature", the internal temperature of the object has a reflection mode energy, the higher the temperature, the greater the energy.