boiler supplier

plc automatic control system gas boiler 1000 kw

Gas oil furnace gauge acceptance and prohibit the use of instructions for conducting oil furnace oil furnace gas this kind, since both sites plc automatic control system boiler 1000 kw products, is one of the sites keywords, therefore, requires a comprehensive knowledge and understanding. Moreover, it is also a common oil furnace type. Therefore, only familiar with this kind of boiler, we have the right to use, so a lot of benefit to themselves. 1. Gas oil furnace acceptance for this kind of a gas oil furnace oil furnace, which work in the acceptance, the main, are: First, when a gas oil furnace transported to the installation site, the manufacturer should be based on factory inventory, an inventory of its parts, whether there are missing and so on. Then, according to the boiler drawings, review of equipment, mainly to check its associated integrity. For example, the large boiler, during transportation, whether there is damage or deformation such problems. 2. Gas oil furnace gas pipeline for oil furnace installation, in which the pipeline installation, requirements mainly refer to "Heat Transfer Fluid heaters Safety Supervision" in, and should refer to product specifications, as well as the process of FIG. to carry out. For the line connection port, in addition to the flange on the connection should be used to this kind of welding. In addition, the pipeline arrangement, there should be a slope, typically from 2% to 3%. In the high line, an exhaust port shall be provided, at its low due outfall. For straight line pipe, if the length is more than 20m, then there should be a thermal expansion joint. 3. conducting oil furnace gas gauge, when the circumstances under which can not be used? In the gas oil furnace, pressure gauge is an important instrument, but if some situation, then can not continue to use its specific terms, it is as follows: Case 1: broken glass on the pressure gauge, or its dial scale is unclear, unrecognizable. Case 2: Pressure gauge seal is damaged, or it exceeds the test period. Three cases: for a limited gauge nail stop, if there is no pressure, the pointer can not limiting, the staple at the back. If the nail is not limiting, pressure gauge, in the absence of pressure, which is the distance between the pointer and the zero position, more than a predetermined allowable error range.

The heat is generated in the furnace part of the plc automatic control system boiler 1000 kw, where fuel is combusted. The fuel used in a boiler contains either chemically bonded energy (Commenly power station boilers include coal bpoler, natural gas boiler, petroleum boiler, liquefied petroleum gas boiler, and various biomass boiler).

Steam plc automatic control system boiler 1000 kw must be shut down? For gas-fired boiler will be some companies: the higher cost of oil-fired boilers and electric heating boilers, many SMEs simply can not afford, the thermal efficiency of the boiler is too low, gas consumption often can not keep up. Many reasons why gas boiler known as the preferred place of the main gas boiler. In business consulting to some customers learned, after being forced to shut down the gas boiler, no steam, the company has only discontinued. In order to survive companies only replace the boiler, to select the gas-fired, oil-fired boiler, electric heating boiler and a biomass pellet boiler. Currently the market for natural gas boilers only major selection, analysis of the reasons is that gas-fired gas boiler is fully automatic, with no pollution. But in reality, many businesses faced to replace the boiler, gas pipeline did not pull in place, some companies simply do not have natural gas pipeline, steam boiler must be shut down? Gas boiler gas boiler, not to mention the natural ventilation. This is the biggest obstacle currently facing.

Beijing New Energy Automobile Co., Ltd. is China's first to operate independently and gain new energy automobile production qualification of new energy auto companies, mainly engaged in new energy vehicles and key parts and components research and development, production, sales and service business segments, and the layout intelligent manufacturing, energy management, smart travel, Internet +, and other strategic emerging industries. In the new energy automobile manufacturing process, and a series of paint drying processes can not do without the help of hot water plc automatic control system boiler 1000 kw. Due to the company before the device has reached less than the growing production needs, the introduction of the 2017 mid-tail electric company producing heating pressure hot water boiler (CEDR0.7--95 / 70-Ⅱ).

Related Information