boiler supplier

rice husk steam generator

How is the use of electromagnetic steam boiler clean energy electromagnetic steam boiler is a clean energy, high efficiency, zero emissions of new products, has changed the past traditional low boiler efficiency, low temperature situation. The product can be used in hospitals, learning laboratories, Inspection and Quarantine and other steam heat sterilization industry. Electric heating rice husk steam generator is an important new strategic product planning system energy companies, both uphold the company's green, Chi made the future of the brand concept, but also responded to the call of the new economic normality to promote industrial structure towards high-end, no precise control waste to energy saving and smart innovation combine. Function Advantage: compared to the resistance wire heating, heating power density of greater 90 seconds of the steam, saving more money! Common fired boiler takes 30 to 60 minutes of the steam. Zero emissions, green environmental protection, no annual filing. Ordinary coal-fired boiler pollution, high energy consumption, is the focus of national governance. Authority of the department, the thermal efficiency of the present device was 96.3%, can greatly save the cost of doing business consumption, energy efficiency <1t / h stratified combustion boiler 1 energy level than 15.89%. Germany's Siemens industrial control systems, a key to start, intelligent control. Unattended, automatic cleaning, 2 to 3 save labor costs. Cumbersome ordinary coal-fired boiler operation, to be full-time personnel to guard the core of this device heating water separation, will not cause leakage accidents. Resistance wire heating water and electricity are not part of the separation, heating tube long-term immersion in water, likely to cause leakage accidents, harm to human health. Explosive coal-fired boilers, the accident rate. The modular installation, you can actually use the steam situation, a single single-station for the steam according to the customer, but also focus on more than one parallel steam supply, out of the box, saving space, cheaper capital costs!

Jinzhou construction and installation company needs an electric heating hot water boiler house construction, after screening and comparison of various brand boiler industry, our excellent results in the cleaning of the boiler industry has been attracted to each other, in mid-2016, the Jinzhou construction and installation the company I signed with an electric heating pressure hot water boiler.

9.Steam from the steam drum is sent to the primary super-heater.

10.Steam is super heated to a high temperature and pressure in the primary super-heaters and then moves to the secondary super-heaters.

11.In the secondary super-heaters steam meets the very hot gases exiting the top of the boiler. The steam is heated to its final temperature and pressure before leaving the boiler as main steam. The main steam is sent to the high pressure steam turbine. The steam turbines drive a generator which produces electricity.

12.Steam exiting the high pressure steam turbine is called cold reheat. It is reheated in the re-heater and sent back to the second steam turbine. By the time the flue gas exits the boiler most of the energy in the coal will be transferred to the water in the boiler. The hot gases are cleaned up before they are sent to a stack. Feed-water is generally supplied by condensed steam from the low pressure steam turbine. Large amounts of cooling water are used to condense this steam into liquid water in the condenser.

Coal fired rice husk steam generator includes an economizer, a steam drum, and the furnace with its steam generating tubes and superheater coils. Necessary safety valves are located at suitable points to relieve excessive boiler pressure. The air and flue gas path equipment include: forced draft (FD) fan, air preheater , boiler furnace, induced draft (ID) fan, fly ash collectors (electrostatic precipitator or baghouse) and the flue gas stack.

Related Information