boiler supplier

sale of gas boiler in sao paulo

Oriental Hawaii Holiday Hotel is located in Xiaogan City of Hubei Province in accordance with international five-star hotel standard design, set business rooms, SPA bath, foot care, indoor spa and other facilities in one of the hotel. Hot water sale of boiler in sao paulo is one of the important facilities normal operation can not be separated. With the pace of Hubei Province in response to the national defense of the blue sky, the use of clean fuels gradually increase the proportion of Oriental Hawaii hotel provides visitors to the more perfect leisure experience a sense of the original wishing more polluted coal-fired boilers to replace clean and green gas-fired boiler. After comparing several vendors boiler industry, a number of R & D results very fast square value in the field of clean fuels, entered into a collaboration with the fast boiler. Fast boiler integrally provided a 1.4MW condensing pressure hot water boiler (CWNSL1.4-95 / 70-Y.Q) according to their actual needs. Put into use, fully meet the needs of Oriental Hawaii Holiday Hotel heating and hot water supply.

Gas oil furnace gas consumption and related questions can automate operations: conducting oil furnace oil furnace gas this kind, it is also the product website and keywords, it is necessary to know and understand the subject, otherwise, can not be familiar with the site and its manufacturer. Therefore, in order to achieve this goal, the following will be introduced to the product description, so that we have to learn content, and thus, can be development and progress in their learning path. 12 000 kcal conducting oil furnace gas, if gas is natural gas which, then, the upper limit of the sale of boiler in sao paulo air consumption of natural gas, how much is? 200,000 kcal conducting oil furnace gas, if it is natural gas, then, the air consumption of the boiler gas limits are as follows: 200,000 divided by the gas heating value and thermal efficiency of the boiler, so as to obtain a particular value . If the boiler thermal efficiency is 94.8%, then, is the specific results of 24.8 cubic meters / h.

When customers need to buy oil and gas sale of boiler in sao paulos, they need to know the boiler capacity that they need. Because the boiler will consume a lot of fuel during operation, the boiler capacity will cause unnecessary losses and increase the boiler cost.

You must know the sale of boiler in sao paulo energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

Related Information