boiler supplier

single drum oil fired hot water boiler supplier

Boiler steam temperature affect the safety and economy temperatures above will be lower than the rated temperature of the device, it will have a bad effect. If the temperature exceeds its rated value, the boiler will cause overheating of the relevant metal material, material creep acceleration, will shorten the life of the boiler. If the temperature is too high, but some of the key components of the boiler would cause damage, can also cause serious and even superheater tube rupture. If the temperature is lower than the rated temperature, vapor enthalpy is reduced, increased air consumption, decreased economy. This will reduce the thermodynamic cycle efficiency of the plant, the steam humidity at the last stage blades of the gas turbine increases, causing erosion and damage to water droplets gas turbine blades, affect the safe operation of the gas turbine. Ruoyin with water vapor causes a decrease in temperature, the moisture in the salt impurities formed in the superheater scale, pipe valves, gas turbine blade, because the superheater lead to reduced heat transfer, the temperature decreased, damage increased wall temperature; and cause the valve plug, the operation failure; and a gas turbine blade erosion, loss of balance and vibration occurs. Temperature fluctuations reason superheater actual heat transfer the vapor does not reach the required amount of heat absorbed corresponding balancing. When the heat absorbed is greater than the heat transfer, the temperature rise; conversely decreased. Many factors affect the temperature change, including both gas side and the vapor side. Such as boiler load increased, but also to ensure the boiler load unchanged or decreased in order to prevent pressure shall increase the amount of fuel and air supply, strengthen the burning, causing the furnace exit flue gas temperature of the flue gas volume increases and lower water temperature , temperature increase; If the oil and gas fuel is combusted in the furnace carbon black is not fully formed, into the superheater flue causing secondary combustion, but also greatly increase the superheat temperature. Reducing the temperature of the main reasons: improper adjustment of combustion, low flame center furnace; superheater area is small, or too much leakage at the furnace wall; Save water flow rising or temperature reduction; drum water level or high gas-water separator separating efficiency is lowered, the humidity of the vapor is increased; superheater tube fouling, reduced heat absorption and the like.

What are the precautions in the loading and installation of gas-fired steam boilers?

Gas-fired steam boilers are a very wide range of special equipments, widely used in food, chemical, paper, textile, construction and other industries. In the process of loading and installing a gas steam boiler, some problems must be paid attention, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

5. The fire resistance grade and fire protection requirements of the boiler house building shall comply with the requirements of the Code for Fire Protection of Building Design and the Code for Fire Protection Design of High-rise Civil Buildings. The ground of the gas steam boiler room should be flat, non-flammable, no water accumulation, and the foundation load should meet the requirements. The power supply voltage of the gas steam boiler room should be stable to avoid causing the electrical components to burn out. If the voltage is unstable, it is recommended to install a voltage regulator. Ventilation equipment should be installed in the boiler room, and the boiler should be kept at room temperature below 50 °.

ZG boiler produces different types of hotel bath oil and gas single drum fired hot water boiler suppliers. These oil and gas boilers can use various fuels such as natural gas, diesel, biogas, gas and methanol according to customer needs. Hotel hot water boilers use these fuels to produce hot water for the hotel, which is generally used for bathing.

Recently, located in Yan'an City, Shaanxi Province, Huanglong held removal of coal-fired boilers mobilization meeting, and promote the coal-fired boiler, "clear" work, Huanglong improve the overall air quality of the environment. The meeting was chaired by the Deputy Mayor Cao Zengjun, County Authority, Environmental Protection Agency, the Public Security Bureau and other coal-fired boilers Chaigai leading group members of the unit involved in coal-fired boilers and Chaigai of 16 enterprises and units attended the meeting.

At the meeting, urban management bureau announced the "urban transformation of coal-fired boiler demolition plan", and county coal-fired boiler demolition work arrangements for the deployment. Program pointed out, the county government before the end of June to remove their coal-fired boiler steam tons per 20,000 yuan subsidy standards in accordance with the relevant provisions of the provincial coal-fired boilers Chaigai subsidies, Chaigai completed in the first six months to the end of August unit task of tons of steam per 10,000 yuan subsidy standards, after the completion of the end of August Chaigai units should be punished to the unit in addition to the removal of subsidies, the person in charge accountable.

A coal-fired boiler Chaigai work is the key point to win the Battle of the blue sky, Huanglong is an important measure to improve the quality of atmospheric environment, the relevant units should fully understand the importance and urgency of the boiler Chaigai work, according to "own boiler demolition themselves, change themselves, government agencies take the lead in demolition, lead change, limited time limit must be removed, must be changed "requirements, implement them.

Second, the change involved units to firmly establish the overall awareness, to overcome the luck, to seize the opportunity boiler Chaigai premium policy, a reasonable choice of the transformation of the way, adhering to standards, early arrangement, early deployment, early start.

Third, the government supervises the room should work together with urban management, environmental protection and other departments, inspectors conduct regular supervision, to dismantle ineffective, slow-moving unit, to be criticized, and timely feedback evaluation to do, do you want to do a good evaluation appraisal work; County JISC to errant Chaigai, affected units and individuals county atmospheric objective assessment of the results, in accordance with the "air pollution prevention of accountability measures" be accountable, accountability, ensure on schedule to complete the work Chaigai city coal-fired boilers.