General Electric boilers 1--2 years, to a certain degree of repair and maintenance, which helps the proper functioning of the electric boiler, regular maintenance for electric boilers but also to protect the basic conditions for its normal operation. 1, boiler maintenance, care must be taken: cut off the power supply, carry out relief. 2, the burner should average every two months removed from the boiler, carefully remove foreign bodies such as dust and soot. Photocell light-receiving surface wipe once a month on average, fuel filter should always be kept clean and good filtering; carefully clean the filter inside the oil pump Note: Do not break the seal. Oil-burner not idle, so as not to pump damage. 3, the water level gauge should always be kept clean, rinse the purge valve is opened, the water level in order to ensure a clear day. 4, pulling the safety valve once a day, to prevent rusting failure. 5, after the completion of repair work, checking tools, materials, accessories are complete, to prevent these and other accessories left in the furnace space.

1, the boiler ready distal spacing of not less than 2/3 of the length of the furnace, and not less than 2 m; vertical boiler can be shortened; bulk boiler is not less than 4 m, and does not affect the operation and maintenance furnace.

2, the boiler side and rear channel spacing of not less than 0.8 m, and should meet the operational and maintenance (such as replacement tube bundle cleaning, stirring the fire, etc.) requirements.

3, the top horizontal boiler headroom not less than 2 m; vertical boiler top clearance height to facilitate the operation and maintenance; headroom boiler room the other channels, should not be less than 2 meters, when the passage of time and no need to operate its headroom height of 0.7 meters.

4, the boiler room is provided for two or more boilers, the boiler the distance between adjacent cylinder not less than 1.5 times the diameter of the boiler.

5, the boiler room is generally preferred fireman operation chamber provided, on the total rated greater than or equal evaporation 4t / h steam boiler (heating or hot water boiler is equal to or greater than 2.8MW) must be provided stoker operating room. Electric boiler tank may be provided in front of the boiler, and to ensure the art to fireman facing boiler water gauge, pressure gauge and other instruments during operation.

6, total rated evaporation is greater than 2t / h of oil, gas boiler room should be set foam fire extinguisher or water spraying systems, Outdoor proper outdoor fire hydrant, other boiler room should also have fire-fighting equipment.

7, the fuel in the boiler room daily oil tank, the oil pump is generally not located in the boiler room, between daily oil tank, the oil pump between the application of the fire resistance of greater than 2.00h wall, the fire resistance of greater than 1.50h floor spaced from the other parts. Daily fuel tank between the boiler room and the door between the oil pump should be able to self-closing fire doors Class A, and let the oil block measures. Household upper tank return pipe to be provided, should be greater than the oil return pipe back to the oil pump.

8, an oil tank and all piping must have a reliable electrostatic grounding, the grounding resistance should not exceed 30 ohms.

December 1, fast Boiler Co., Ltd. received customers from Ukraine, headquarters staff warmly received the guests from afar, and send a professional team of foreign trade and technical engineers accompany the customer to the company headquarters R & D centers, laboratories, manufacturing plant and cloud services platform to showcase and explain.

Front electric steam boilers which have to do preparatory work? Electric steam boiler, the fuel is able to heat water or another heating energy to become hot water or steam machinery. Pot original meaning refers to containers that hold water heated on the fire place burning stove refers to fuel, boiler and furnace boiler consists of two parts. (1), the operator must understand how this boiler, location, performance and working methods of the various accessories. (2), check the oil combustion, and each nozzle connection, power supply and the burner, the pump, the boiler installation accessory. (3), a clear main steam valve open, after closing the normal close it. (4), water level gauge inspection, confirmation flexible water level, normal position. (5), the pressure regulator is properly tuned, regulate combustion damper.