boiler supplier

top boiler for fertilizer in the world

Beijing New Energy Automobile Co., Ltd. is China's first to operate independently and gain new energy automobile production qualification of new energy auto companies, mainly engaged in new energy vehicles and key parts and components research and development, production, sales and service business segments, and the layout intelligent manufacturing, energy management, smart travel, Internet +, and other strategic emerging industries. In the new energy automobile manufacturing process, and a series of paint drying processes can not do without the help of hot water top boiler for fertilizer in the world. Due to the company before the device has reached less than the growing production needs, the introduction of the 2017 mid-tail electric company producing heating pressure hot water boiler (CEDR0.7--95 / 70-Ⅱ).

Premix combustion ratio of air and gas can be controlled within the range, the mixed gas to ensure excess air ratio between 1.2-1.3, both to ensure full combustion of the fuel, but also to reduce the formation of nitrogen oxides, the top boiler for fertilizer in the world reduce the heat loss .

Fault top boiler for fertilizer in the world long, short sootblower: sootblowers is essential for an important part of a boiler, its role is to purge the ash heating surface, heating surface remains clean, in order to improve the heat transfer effect, to ensure that the thermal efficiency of the boiler, to prevent the heating surface of the coking device. It points both long and short, then, the next will come to tell you what it's common faults and solutions: 1, long soot blower common failure symptoms: (1) failed to start and soot blower soot blower is not from the back. (2) leakage into the boiler soot blowers. (3) at the inner tube was sealed severely sootblower steam leakage, water leakage poppet valve lifting rod. (4) steam inlet flange sootblower steam leakage. Analysis: (1) the control part of the fault. (2) motor failure. (3) firing barrel deformation or Jam. (4) damage to the valve body and the valve seat surface binding. (4) sootblower boiler tubes, damage to the poppet valve packing. (5) an inlet flange sootblower graphite spiral wound gasket failure damaged. Treatment: (1) an electric contact personnel check and control system of the expansion power supply line La on whether the device. (2) an outer barrel furnace boiler sootblower bending portion rapidly burn local manual hand-crank or exit from the barrel as the slide bearing support readjust and corrected barrel, the barrel as serious deformation should be replaced with new of. (3) isolated after the individual valve lift system maintenance, disassembly of the poppet valve and the valve seat and the valve body is polished with a special tool maintenance, such as severe damage to the valve seat or the valve body and replaced. (4) the inner tube packing isolated after replacement of individual systems, note moderate tightening gland studs. (5) to replace the gasket flange. Preventive measures: (1) strict inspection process. (2) to strengthen the inspection, to detect problems in time.

Environmental performance a: large combustion chamber space, make full use of radiation heat transfer, with high quality and reliable imported burner, the fuel can get complete combustion, significantly reduce emissions of harmful smoke constituents. Testing by the legal department, steam, hot water top boiler for fertilizer in the worlds comply with national environmental requirements, is the ideal environmentally friendly products.

Related Information