boiler supplier

waste heat boiler parts brands

This time, the party quickly staff also two school children brought nearly this reading materials, together with the 2017 contributions, a total of two school books donated more than 3000, to add more color to the world of children. Fang fast philosophy tells us that the work should be "fine industry", Jingye is to "+ dedicated professional", it requires us to "long-term focus and become an expert." Shu ten years, a hundred years trees, love must not be "superficial", and to focus on "little", and stick to it. This down a few years later, bit by bit we will help to gradually bear fruit, harvest fruit.

6 tons of gas steam waste heat boiler parts brands start / ignition / boost a description, unit 1 starts, the boiler starts to open the first draft fan. 2, the induced draft fan starts normally from about 1 to 3 minutes blower opening. 3, starting Cleaner. 4, rotation of the grate, and adjusted appropriately stalls second ignition 1, ignition starts after all the examination was normal, the amount of wind and the wind blowing good after normal combustion seam to be adjusted to maintain a certain furnace pressure (-15 ~ -30Pa ). 2, when the temperature is increased Stokes is not too fast, the time from ignition to supply the steam required for less than 2 hours. 3, when the air vent has steam coming off when air vent. Third, the booster 1, when the boiler is boosted to 0.1 ~ 0.2MPa, to the flushing water pressure gauges trap. 2, when the boiler is boosted to 0.2 ~ 0.3MPa, to check every one hole, hand holes, valves and other leaks, if the screws are loose (if the screws are loose, the screw must be tightened). 3 when the boiler is pressurized to 0.3 to 0.4MPa, sewage drain valve open time of the drum, reducing the temperature difference between the upper and lower drum to promote water circulation. 4, when the drum steam pressure gradually increased, the components of the boiler to be noted that there are no special or abnormal sound occurs, if the above anomalies, should immediately check, shutdown can check, if necessary, until the fault is cleared before continuing 6 run. 5, during boiler Stokes, economizer outlet water temperature must be monitored to prevent moisture inside of the economizer, economizer valve leading to the drum can be closed if necessary, open the economizer recirculation valve leading to the tank, of water economizer alone, but before the steam supply to return to normal position, to prevent water shortages.

If there is no long-term use of gas steam waste heat boiler parts brands, at least once a month to check the boiler. If quicklime crumbled into powder in the bore need for timely replacement of lime, to ensure that safeguards within the drying chamber gas steam boiler from corrosion moisture. 2, wet wet maintenance operation process is particularly maintenance: After releasing the water in the furnace, remove dirt inside, to fill the already processed water and then heated to a temperature requirement of the bore; and then let the water all of the gas is discharged to outside the furnace, closing all valves.

As a clean fuel waste heat boiler parts brands R & D and manufacturing pioneer - fast boiler, since the industry remains firmly committed to the development and use of clean fuels (gas, electricity), with extensive industry experience. At the same time, fast boiler keep pace with the mainstream of society development, the combination of Internet, networking, big data platform, intelligent boiler, security and simplification.

Related Information