boiler supplier

waste oil boiler for sale

To do a solid job Huoqiu County 35 tons of steam per hour and less industrial coal-fired waste boiler for sales as well as glass, ceramics industry, coal-fired kilns clean energy alternatives work, according to "Anhui atmosphere to do on the issuance of <35 hour Anhui cities and built-up areas tons of steam coal-fired boilers and the following industry and glass, ceramic industry, coal-fired kilns clean energy alternative implementation of the program "notice" (Anhui atmosphere do [2018] No. 11), "Lu'an office atmosphere on the issuance of

A scoping

1, in the present embodiment "industrial coal-fired boilers" refers to coal as the fuel, steam or hot water for industrial enterprises, primarily to meet the production process, the power (accounting for 50% or more) and the like required for the boiler, free professional heating companies coal-fired boilers.

2, in this embodiment, "glass, ceramic industry, coal-fired kiln" refers to coal as the fuel, comprising a direct-fired coal preparation or coal as a raw material gas-segment, two-stage gas furnace, firing, heating the finished product facility.

3, the program of "built-up area" means Huoqiu county area (county towns and the former North Industrial Park), Anhui Huoqiu Economic Development Zone, excluding the township.

4, in this embodiment, "clean energy" refers to electricity, natural gas, coal gas clean large, clean oil (alcohol) and all other non-renewable energy sources of renewable energy.

The main components of organic heat waste boiler for sale burner natural gas burner 5 is constructed of the following system components: 1, the function that the air supply system, air supply system into the wind speed a certain amount of air to the combustion chamber, the main components are: shell body, fan motors, fan impeller, air guns fire tube, damper controller, damper baffle, a cam adjusting mechanism diffuser plate. 2, the ignition system functions in that the ignition system ignites a mixture of air and fuel, its main components are: the ignition transformer, the ignition electrode, a high voltage electrical cable fire. A more secure electronic ignition system called ignition pulse, is widely used Zhuoyi energy and other natural gas boiler manufacturers. Which facilitate saving, you can simply press a finger, and safe, does not occur due to unexpected accidents occur flame, once the stall state occurs, the control system can close the solenoid valve, off gas passage 3 days , system monitoring function monitoring system is to ensure that the burner safe and stable operation, the main components are flame detectors, pressure monitors, temperature monitors and the like. 4, functions of the fuel system of the fuel system is to ensure that the desired fuel burner. The fuel oil burner system are: tubing and fittings, pumps, solenoid valves, nozzles, heavy oil preheater. Gas burner mainly a filter, pressure regulator, solenoid valve, and then firing solenoid valve, the fuel valve. 5, electronic control system electronic control system command center and the focal the above system, the primary control element is a control box, with different programmer for different burners, the common programmer has: LFL series, the LAL series, LOA series, LGB series, the main difference is the time of each different program steps. The controller 1, ultra Encyclopedia Chinese LCD display, built-in luminous incandescent lamp, regardless of the day night, the screen clearly visible. 2, the image level animation display state, condition, valve status, alarm status, operation of the boiler at a glance. 3, CPU intelligent central processor, all the programs focused on a digital chip, scalability, high degree of automation, simple, and powerful. 4, includes a time setting, temperature setting, setting valve, a continuous setting, timer setting, and other control functions pressure setting, arbitrarily set the working state. 5, includes a low level alarm (anti-dry function), ultra high temperature alarm, alarm and other ultra-high pressure alarm and chain protection (shutdown), eliminate safety hazards. 6, detailed self-diagnosis, record, store alarm information, enables ready access to an alarm condition, easy inspection and maintenance.

Industrial gas steam waste boiler for sale room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.

Palm oil mill produces large quantity of waste, that is palm kernel shell. Palm kernel shells are the shell fractions left after the nut has been removed after crushing in the palm oil mill. Palm kernel shells are a fibrous material residue of palm oil milling operation. Biomass residues are the main source of energy input to the mills using cogeneration system. And it has been estimated that total biomass energy potential has accounted a large proportion of total power produced in countries, especially places where have rich biomass energy. There is excess biomass residue produced than needed as fuel in waste boiler for sales to meet energy and process heat demand with efficient cogeneration system. The cogeneration system is the best-proven method and is sustainable long as there is supply of palm fruit.

Related Information