boiler supplier

water tube gas vertical steam boiler

Industrial gas water tube vertical steam boiler room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

CBM low pressure water tube vertical steam boiler types

WNS series oil/gas low pressure steam boiler

Steam boiler which automatically displays the instrument will encounter problems in accordance with the water tube vertical steam boiler fuel can be divided into electric steam boiler, steam boiler fuel, gas steam boiler using the water level; in accordance with the constitution can be divided into vertical steam boilers, horizontal steam boiler, small steam boiler mostly single, double the return of the vertical structure, large steam boilers and more horizontal structure of three return. There lowland water or a display apparatus using the automatic water level when the water level in steam boiler water level is only a low level of installed devices, and even water pipes are too small; the water level or a Low level using the instrument, when the steam boiler is automatically displayed only one water; a water drain device, drain cocks no ground; on a drum water level is effective, other water damage; plug screwed on the fixed level; on tap water gauge leak, leaking; water false water level on the display unit; the drum water level in the two water gauge level of inconsistency; water is often broken glass; water gauge glass without guard; a water gauge glass plate not shown in the red line indicating the water level; water gauge glass plate is dirty, the water level observation is unclear. Steam boiler water level glass observation level of inconsistency and the main reason is unclear steam boiler for long periods of time rinse in running water, a daily maintenance is not carried out, resulting in water cock rust, gas, water and even the block, or insufficient packing or aging deterioration. False water level phenomenon, in addition to gas, water or even the cock pipe is blocked, but also could be vapor, the water pipe connected to the water level due to misalignment connected; steam, water tap handle installed the wrong position resulting cock closed, since there poor water quality, the water level in the boiler and false priming. Water gauge glass is broken mainly steam, water faucet centerline not aligned, the presence of glass bending stress; long glass without expansion gap; water gauge is being cold draft at window glass, and glass pipe quality was poor. During the operation of the boiler, the water level was found is not clear, to shutdown immediately ultra-high water level, timely detection of problems.

Recently, Chengdu issued the "2019 Chengdu air pollution prevention and control action plan" to optimize adjustments programs around the industrial, energy, transportation, land use structure, proposed Yajian coal, pollution abatement, control car cut oil, clean dust, haze rule technology, integrated law enforcement operations as well as six 50 detailed measures.

According to the provincial government issued the goal of improving air quality in 2019, Chengdu PM2.5年均浓度控制在 year 52 micrograms / cubic meter and below, the number of days of good air quality rate of 67.6% and above.

Chengdu six proposed action, emphasizing the Internet technology means to achieve "smart governance gas": First, accelerating into the key source of business to install online monitoring equipment; the second is the full implementation of the wisdom of the site management platform in the city's housing construction and municipal construction site, to build green construction demonstration sites; Third, establish and improve municipal departments emissions inventory information sharing liaison mechanisms and environmental systems City - District - the town (street) three emission inventory liaison mechanisms; Fourth, focus on road vehicle emissions, drawn dynamically updated mobile source pollution maps.

At the same time, promote green industrial development, increase efforts to eliminate high energy consumption and high pollution industries: on the one hand, continue to promote coal-fired boiler, "clear" work; in an orderly way in key areas of old gas (oil) boilers implementation of clean energy transformation; increase industrial furnaces efforts to eliminate non-compliance. On the other hand, the promotion of green travel, speed up the process of rail transit; in public transport, sanitation, landscaping, postal and other fields of new energy vehicles, accelerate the construction of charging (change) station, charging pile.

Related Information