boiler supplier

wholesaler vertical gas water boiler

Exhaust gas has been plagued by sewage paper industry, paper industry pollution problems of the country very seriously. Fujian Heng paper packaging company has been committed to the use of clean-type boiler paper processing. October 22, 2016, David Carse, the paper with my company, signed a 6 tons of steam an integral condensing steam boiler for the production of corrugated cardboard and other paper products. I provided the boiler greatly solve the problem of sewage wastewater Heng paper. After the boiler operation, both to meet local environmental requirements, but also reduce operating costs for the constant boiler paper products.

Industrial boilers can do much tonnage? Industrial boiler range is very wide use, chemical, food, power plants, textile, paper making, metallurgy and other industries need to use the boiler. People often say that industrial boiler equipment including industrial steam boilers, hot wholesaler vertical water boilers, and other industries. Pioneer fast boiler is a boiler, gas boiler electric field, it can be made into industrial boilers from 0.5 to 130 tons according to the needs of different tonnages. Fang quick existing boiler over 200 kinds of models, should your business have a need for industrial boilers, then please feel free to call.

Gas boiler precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.

When using a chemical plant boilers have what precautions when using chemical plant boiler what precautions? The main industrial production of industrial boiler to provide heat to maintain the power production plant operations, mainly using a steam boiler of electricity or natural gas industry, the other is based on coal as a raw material by the waste heat recovery operation to maintain the production of traditional electric power industrial boilers, widely used in industrial production. What precautions when using chemical plant boiler? (1) When using industrial boilers, the operator should not only have relevant operational knowledge and skills, but also prohibits unauthorized departure, the boiler is no state in the operation to reduce accidents. Pressure boiler boiler water level is too high or too large. (2) staff to improve the working pressure of industrial boilers, should undergo a rigorous technical evaluation of relevant professional departments, before adjustments. Pressure gauge and safety valve to avoid failure resulting industrial boiler overpressure mislead the operator allowed to adjust. Meanwhile, to strengthen skills related to operating personnel, the timely processing of boiler operation anomalies. (3) prior to use industrial boilers, the boiler should be fully checked structure and current and voltage is within the normal range. To avoid unreasonable boiler structure, poor weld quality, safety accessories related failures caused by industrial accidents occurred in the boiler during operation, and should be sufficient for boiler water treatment prior to use to reduce the incidence of accidents in the run and run.

Related Information